{"document":{"doc_id":130624,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of revised CPP draft final rule package for Interagency Review (2060-AR33) (8/1/2015)","date":"2015-10-23","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2013-0602-36833","source_native_id":"EPA-HQ-OAR-2013-0602-36833","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2013-0602"],"rins":["RIN 2060-AR33","RIN 2060-AR88"],"related":[{"doc_id":11531,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units","date":"2014-06-18"},{"doc_id":48268,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"RIA for the Final Revisions to the National Ambient Air Quality Standards for Particulate Matter; 2012 [EPA-452/R-12-005]","date":"2014-06-18"},{"doc_id":48280,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Proposed Carbon Pollution Guidelines for Existing Power Plants and Emission Standards for Modified and Reconstructed Power Plants - June 2014 [EPA -542/R-14-002]","date":"2014-06-18"},{"doc_id":48295,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"2008 Ozone NAAQS RIA Benefits Chapter","date":"2014-06-18"},{"doc_id":48334,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Email to OMB - Revisions to Chapter 9 of RIA (May 23, 2014)","date":"2014-06-18"},{"doc_id":48380,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding organization of meetings on the EGU GHG Existing Source NPRM for a legal discussion and RIA briefing (2060-AR33) (4/10/2014)","date":"2014-06-18"},{"doc_id":48386,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding a meeting on the EGU GHG Existing Source NPRM RIA results compared to EIA and RFF projections (2060-AR33) (4/24/2014)","date":"2014-06-18"},{"doc_id":48402,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (single document) (2060-AR33) (5/28/2014)","date":"2014-06-18"},{"doc_id":48436,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Summary of the Updated Regulatory Impact Analysis (RIA) for the Reconsideration of the 2008 Ozone National Ambient Air Quality Standard (NAAQS); Section 3: Re-analysis of the Benefits of Attaining Alternative Ozone Standards to Incorporate Current Methods","date":"2014-06-18"},{"doc_id":48486,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA chapters (2060-AR33) (5/15/2014)","date":"2014-06-18"},{"doc_id":48840,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding a meeting on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/21/2014)","date":"2014-06-18"},{"doc_id":48854,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding Interagency request for EGU GHG Existing Source NPRM RIA IPM Output (2060-AR33) (4/17/2014)","date":"2014-06-18"},{"doc_id":48903,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA, Chapter 4 (2060-AR33) (5/26/2014)","date":"2014-06-18"},{"doc_id":48915,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request to combine the EGU GHG Existing Source NPRM RIA chapters into one single document (2060-AR33) (5/16/2014)","date":"2014-06-18"},{"doc_id":49770,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA and Alternative Renewable Energy (RE) Approach TSD (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":49781,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA, Chapter 8 (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":49797,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/24/2014)","date":"2014-06-18"},{"doc_id":49812,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding the EGU GHG Existing Source NPRM RIA (2060-AR33) (4/21/2014)","date":"2014-06-18"},{"doc_id":49825,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM Preamble and RIA (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":49843,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (Clean) (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":49893,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding EGU GHG Existing Source NPRM Building Blocks 1 and 2 Memo and RIA (2060-AR33) (5/21/2014)","date":"2014-06-18"},{"doc_id":49908,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":49942,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding a meeting on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/22/2014)","date":"2014-06-18"},{"doc_id":50036,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Proposed Carbon Pollution Guidelines for Existing Power Plants and Emission Standards for Modified and Reconstructed Power Plants [EPA -542/R-14-002]","date":"2014-06-18"},{"doc_id":50083,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Final Ozone NAAQS Regulatory Impact Analysis; Chapter 6: Incremental Benefits of Attaining Alternative Ozone Standards Relative to the Current 8-hour Standard (0.08 ppm)","date":"2014-06-18"},{"doc_id":50099,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (Redline and Clean) (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":50140,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for EGU GHG Existing Source NPRM RIA briefing and the 111(b) regulatory text TSD (2060-AR33) (4/18/2014)","date":"2014-06-18"},{"doc_id":50155,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/28/2014)","date":"2014-06-18"},{"doc_id":50171,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA, Executive Summary and Chapters 3 and 6 (2060-AR33) (5/29/2014)","date":"2014-06-18"},{"doc_id":50186,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Final Revisions to the National Ambient Air Quality Standards for Particulate Matter [EPA-452/R-12-005]","date":"2014-06-18"},{"doc_id":50249,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/25/2014)","date":"2014-06-18"},{"doc_id":50263,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA, Chapter 4 (2060-AR33) (5/28/2014)","date":"2014-06-18"},{"doc_id":50278,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/14/2014)","date":"2014-06-18"},{"doc_id":50326,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Memo: Emission Reductions, Costs, Benefits and Economic Impacts Associated with Buliding Blocks 1 and 2.","date":"2014-06-18"},{"doc_id":50349,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"California Standard Practice Manual: Economic Analysis of Demand-Side Programs and Projects","date":"2014-06-18"},{"doc_id":50394,"source":"ria","org":"EPA","doc_type":"benefit_cost_analysis","title":"Benefit-Cost Analysis in Environmental, Health, and Safety Regulation: A Statement of Principles","date":"2014-06-18"},{"doc_id":50413,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"LBNL Energy and Economic Impacts of U.S. Federal Energy and Water Conservation Standards Adopted From 1987 Through 2012","date":"2014-06-18"},{"doc_id":50417,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Memorandum: Emission Reductions, Costs, Benefits and Economic Impacts Associated with Building Blocks 1 & 2","date":"2014-06-18"},{"doc_id":131025,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Large\nPublic Power Council (2060-AR33) (4/17/2014)","date":"2014-06-18"},{"doc_id":131026,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of white paper from Pennsylvania Department of Environmental Protection under EO 12866 (2060-AR33) (4/10/2014)","date":"2014-06-18"},{"doc_id":131027,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the National Rural Electric Cooperative Association (2060-AR33) (4/17/2014)","date":"2014-06-18"},{"doc_id":131028,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the National Climate Coalition (2060-AR33) (4/29/2014)","date":"2014-06-18"},{"doc_id":131029,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Canadian Electricity Association (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131030,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with RePower South (2060-AR33) (4/29/2014)","date":"2014-06-18"},{"doc_id":131031,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Natural Resources Defense Council (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131032,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Association of Home Appliance Manufacturers (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131033,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with Sierra Club (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131034,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with Alevo (2060-AR33) (5/8/2014)","date":"2014-06-18"},{"doc_id":131035,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of white paper from Coalition for Innovative Climate Solutions under EO 12866 (2060-AR33) (4/9/2014)","date":"2014-06-18"},{"doc_id":131036,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Coalition for Innovative Climate Solutions (2060-AR33) (4/11/2014)","date":"2014-06-18"},{"doc_id":131037,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with Waste Management (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131038,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for multiple TSDs on the EGU GHG Existing Source NPRM (2060-AR33) (5/29/2014)","date":"2014-06-18"},{"doc_id":131039,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for Alternative Renewable Energy (RE) Approach TSD on the EGU GHG Existing Source NPRM (2060-AR33) (5/29/2014)","date":"2014-06-18"},{"doc_id":131040,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding Interagency Comments on the EGU GHG Existing Source NPRM GHG Abatement TSD, Chapter 5 (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":131041,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding scheduling a meeting to discuss Interagency Comments on the EGU GHG Existing Source NPRM (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":131042,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding organization of a meeting on the EGU GHG Existing Source NPRM with DOJ (2060-AR33) (4/17/2014)","date":"2014-06-18"},{"doc_id":131043,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 and 13563 review - EGU GHG Existing Source NPRM","date":"2014-06-18"},{"doc_id":131044,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Documentation of Changes Made During OMB Review Under E.O. 12866 and 13563 through May 28, 2014 - EGU GHG Existing Source NPRM","date":"2014-06-18"},{"doc_id":131045,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for EGU GHG Existing Source NPRM Survey of Existing State Policies and Programs (2060-AR33) (4/4/2014)","date":"2014-06-18"},{"doc_id":131046,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding status of briefing materials for the overview briefing on the EGU GHG Existing Source NPRM (2060-AR33) (4/7/2014)","date":"2014-06-18"}],"references":[{"citation_id":830783,"raw_reference":"Systems, IEEE Press, at 2-4 (2d ed. 2010). 66 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"Systems, IEEE Press, at 2-4 (2d ed","cited_year":"2010","cited_title":"66 Casazza, J. and Delea, F., Understanding Electric Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830784,"raw_reference":"Systems, IEEE Press, at 5-6 (2d ed. 2010). Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs. If these costs can be spread to more customers, then this can reduce the amount that each individual customer pays. Federal Energy Regulatory Commission, Energy Primer: A Handbook of Energy Market Basics, at 38 (2012), available at http://www.ferc.gov/market-oversight/guide/energy-primer.pdf. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 148 of 1626 systems with federal regulation coming later in response to public concerns about rising electricity costs.67","cited_authors":"Systems, IEEE Press, at 5-6 (2d ed","cited_year":"2010","cited_title":"Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ferc.gov/market-oversight/guide/energy-primer.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830785,"raw_reference":"Initially, states had broad authority to regulate public utilities, but gradually federal regulation increased. In 1920, Congress passed the Federal Water Power Act, creating the Federal Power Commission (FPC) and providing for the licensing of hydroelectric facilities on U.S. government lands and navigable waters of the U.S.68 During this time period, the U.S. Supreme Court found that state authority to regulate public utilities is limited, holding that the Commerce Clause does not allow state regulation to directly burden interstate commerce.69 For example, in Public Utilities Commission of Rhode Island v. Attleboro Steam & Electric Company, Rhode Island sought to regulate the electricity rates that a Rhode Island generator was charging to a company in Massachusetts that resold the electricity to Attleboro, Massachusetts.70 The Supreme Court found that Rhode Island’s regulation was impermissible because","cited_authors":"Initially, states had broad authority to regulate public utilities, but gradually federal regulation increased. In","cited_year":"1920","cited_title":"Congress passed the Federal Water Power Act, creating the Federal Power Commission (FPC) and providing for the licensing of hydroelectric facilities on U.S. government lands and navigable waters of the U.S.68 During this time period, the U.S. Supreme Court found that state authority to regulate public utilities is limited, holding that the Commerce Clause does not allow state regulation to directly burden interstate commerce.69 For example, in Public Utilities Commission of Rhode Island v","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830786,"raw_reference":"NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”76 In 1977, the FPC became FERC after Congress passed the Department of Energy Organization Act. By the 1930s, regulated electric utilities that provided the major components of the electrical system - generation, transmission, and distribution - were common.77 These regulated monopolies are referred to as vertically-integrated utilities. As utilities built larger and larger electric generation plants, the cost per unit to generate electricity decreased.78","cited_authors":"NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”76 In","cited_year":"1977","cited_title":"the FPC became FERC after Congress passed the Department of Energy Organization Act","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830787,"raw_reference":"Systems, IEEE Press, at 159 (2d ed. 2010). 103 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"Systems, IEEE Press, at 159 (2d ed","cited_year":"2010","cited_title":"103 Casazza, J. and Delea, F., Understanding Electric Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830788,"raw_reference":"Today, federal, state, and local entities regulate electricity providers.105 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”106 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that electricity are privately owned.107 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct 2005, the federal government’s role in follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id. at 210 (quoting Connecticut Light & Power Co. v. Federal Power Commission, 324 U.S. 515, 529 (1945) (emphasis omitted)).","cited_authors":"Today, federal, state, and local entities regulate electricity providers.105 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”106 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that electricity are privately owned.107 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct","cited_year":"2005","cited_title":"the federal government’s role in follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830789,"raw_reference":"Systems, IEEE Press, at 214 (2d ed. 2010).","cited_authors":"Systems, IEEE Press, at 214 (2d ed","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830790,"raw_reference":"Systems, IEEE Press, at 213 (2d ed. 2010).","cited_authors":"Systems, IEEE Press, at 213 (2d ed","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830791,"raw_reference":"Systems, IEEE Press, at 213 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 160 of 1626 electricity regulation greatly increased.108 “The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry.”109 2. Electric system dispatch System operators typically dispatch the electric system through a process known as Security Constrained Economic Dispatch.110 Security Constrained Economic Dispatch has two components – economic generation of generation facilities and ensuring that the electric system remains reliable.111 Electricity demand varies across geography and time in response to numerous conditions, such that electric generators are constantly responding to changes in the most reliable and cost108","cited_authors":"Systems, IEEE Press, at 213 (2d ed","cited_year":"2010","cited_title":"The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830792,"raw_reference":"Systems, IEEE Press, at 214 (2d ed. 2010). 110 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic","cited_authors":"Systems, IEEE Press, at 214 (2d ed","cited_year":"2010","cited_title":"110 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830793,"raw_reference":"Ontario, Canada experienced the largest power blackout to date, impacting 30 million people.114 In response to the 1965 blackout and a Federal Power Commission recommendation,115 industry North American Electric Reliability Corporation, History of","cited_authors":null,"cited_year":null,"cited_title":"Ontario, Canada experienced the largest power blackout to date, impacting 30 million people.114 In response to the 1965 blackout and a Federal Power Commission recommendation,115 industry North American Electric Reliability Corporation, History of","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830794,"raw_reference":"NERC, at 2 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 117 North American Electric Reliability Corporation, History of","cited_authors":"NERC, at 2","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830795,"raw_reference":"NERC, at 4 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 118 North American Electric Reliability Corporation, History of","cited_authors":"NERC, at 4","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830796,"raw_reference":"NERC, at 3 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 119 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 1 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. The outage impacted areas within Ohio, Michigan, Pennsylvania, New York, Vermont, *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 164 of 1626 task force to investigate the causes of the blackout and made recommendations to avoid similar outages in the future. One of the task force’s major recommendations was that the U.S. Congress should pass legislation making electric reliability standards mandatory and enforceable.120 Congress responded to this recommendation in EPAct 2005, adding a new section 215 to the Federal Power Act making reliability standards mandatory and enforceable and authorizing the creation of a new Electric Reliability Organization (ERO). Under this new system, FERC certifies an entity as the ERO. The","cited_authors":"NERC, at 3","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830797,"raw_reference":"ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so independently.121 In 2006, the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.122 “NERC develops","cited_authors":"ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so independently.121 In","cited_year":"2006","cited_title":"the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.122 “NERC develops","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830798,"raw_reference":"Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 120 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. 121 Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 118 FERC ¶ 61,218, at P 3 (2007) (citing 16","cited_authors":"Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 120 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr","cited_year":"2004","cited_title":"available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830799,"raw_reference":"Sustainable Energy, 2015 Factbook: Sustainable Energy in","cited_authors":null,"cited_year":null,"cited_title":"Sustainable Energy, 2015 Factbook: Sustainable Energy in","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830800,"raw_reference":"Systems, IEEE Press, at 220-221 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 173 of 1626 facilities144 or small generation resources that use renewables such as wind, solar, biomass, geothermal, or hydroelectric power as their primary fuels.145 Through PURPA, Congress supported the development of more renewable energy generation in the U.S. States have also taken a significant lead in requiring the development of renewable resources. In particular, a number of states have adopted renewable portfolio standards (RPS). As of 2013, 29 states and the District of Columbia have enforceable","cited_authors":"Systems, IEEE Press, at 220-221 (2d ed","cited_year":"2010","cited_title":"*** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 173 of 1626 facilities144 or small generation resources that use renewables such as wind, solar, biomass, geothermal, or hydroelectric power as their primary fuels.145 Through PURPA, Congress supported the development of more renewable energy generation in the U.S. States have also taken a significant lead in requiring the development of renewable resources","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830801,"raw_reference":"RPS or similar laws.146 Use of RE continues to grow rapidly in the U.S. In 2013, electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.147 In 2013, U.S. nonhydro RE capacity for the total electric power industry exceeded Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam. Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010). 145 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"RPS or similar laws.146 Use of RE continues to grow rapidly in the U.S. In","cited_year":"2013","cited_title":"electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.147 In 2013, U.S. nonhydro RE capacity for the total electric power industry exceeded Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830802,"raw_reference":"Systems, IEEE Press, at 220-221 (2d ed. 2010). 146 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015). 147 Energy Information Administration, Annual Energy Outlook 2015 with Projections to 2040, at ES-6 (2014) and Energy Information","cited_authors":"Systems, IEEE Press, at 220-221 (2d ed","cited_year":"2010","cited_title":"146 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015)","cited_venue":null,"cited_doi":null,"cited_url":"http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830803,"raw_reference":"Administration, Monthly Energy Review, May 2015, Table 7.2b, available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 174 of 1626 80,000 MW, reflecting a fivefold increase in just 15 years.148 In particular, there has been substantial growth in the wind and photovoltaic (PV) markets in the past decade. Since 2009, U.S. wind generation has tripled and solar generation has grown twenty-fold.149 The global market for RE is projected to grow to $460 billion per year by 2030.150 RE growth is further encouraged by the significant amount of existing natural resources that can support RE production in the United States.151 In the Energy Information Administration’s Annual Energy Outlook 2015, RE generation grows substantially from 2013 to 2040 in the reference case and all alternative cases.152 In the reference case, RE generation increases by more than 70 percent from 2013 Non-hydro RE capacity for the total electric power industry was more than 16,000 megawatts (MW) in 1998. Energy Information","cited_authors":"Administration, Monthly Energy Review, May","cited_year":"2015","cited_title":"Table 7.2b, available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830804,"raw_reference":"EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In 1998, the EPA promulgated the NOx SIP Call, which required 23 upwind states to reduce emissions of NOx that would impact downwind areas with ozone problems. The EPA determined emission reduction requirements based on reductions achievable through “highly cost-effective” controls—i.e., controls that would cost on average no more than $2,000 per ton of emissions reduced.172 The EPA determined that a uniform emission rate on large EGUs coupled with a cap-and-trade program was one such set of highly cost-effective controls.173","cited_authors":"EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In","cited_year":"1998","cited_title":"highly cost-effective","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830805,"raw_reference":"The D.C. Circuit upheld the NOx SIP Call 63 FR at 57377–78. 63 FR at 57377–78. In addition to EGUs, the NOx SIP Call also set budgets based on highly cost-effective emission reductions from certain other large sources. Id. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 181 of 1626 in most significant respects, including its use of costs to apportion emission reduction responsibilities.174 b. Clean Air Interstate Rule (CAIR). In 2005, the EPA promulgated CAIR, which required 28 upwind states to reduce emissions of NOx and SO2 that would impact downwind areas with projected nonattainment and maintenance problems for ozone and PM2.5. The EPA determined emission reduction requirements based on “controls that are known to be highly cost effective for EGUs.”175 The EPA established cap-and-trade programs for sources of NOx and SO2 in states that chose to participate in the trading programs via their SIPs and for states ultimately subject to a","cited_authors":"The D.C. Circuit upheld the NOx SIP Call 63 FR at 57377–78. 63 FR at 57377–78. In addition to EGUs, the NOx SIP Call also set budgets based on highly cost-effective emission reductions from certain other large sources. Id. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 181 of 1626 in most significant respects, including its use of costs to apportion emission reduction responsibilities.174 b. Clean Air Interstate Rule (CAIR). In","cited_year":"2005","cited_title":"controls that are known to be highly cost effective for EGUs","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830806,"raw_reference":"MATS rule are required to comply by April 16, 2012 or upon startup, whichever is later. Existing sources subject to the MATS rule were required to begin meeting the rule’s requirements on April 16, 2015. Controls that will achieve the MATS performance standards are being installed on many units. Certain units, especially those that operate infrequently, may be considered not worth investing in given today’s electricity market, and are closing. The final","cited_authors":"MATS rule are required to comply by April 16, 2012 or upon startup, whichever is later. Existing sources subject to the MATS rule were required to begin meeting the rule’s requirements on April 16","cited_year":"2015","cited_title":"Controls that will achieve the MATS performance standards are being installed on many units","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830807,"raw_reference":"Systems, IEEE Press, at 2-4 (2d ed. 2010). 77 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"Systems, IEEE Press, at 2-4 (2d ed","cited_year":"2010","cited_title":"77 Casazza, J. and Delea, F., Understanding Electric Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830808,"raw_reference":"Systems, IEEE Press, at 5-6 (2d ed. 2010). Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs. If these costs can be spread to more customers, then this can reduce the amount that each individual customer pays. Federal Energy Regulatory Commission, Energy Primer: A Handbook of Energy Market Basics, at 38 (2012), available at http://www.ferc.gov/market-oversight/guide/energy-primer.pdf. Formatted: Font: (Default) Courier New *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 149 of 1638 systems with federal regulation coming later in response to public concerns about rising electricity costs.78","cited_authors":"Systems, IEEE Press, at 5-6 (2d ed","cited_year":"2010","cited_title":"Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ferc.gov/market-oversight/guide/energy-primer.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830809,"raw_reference":"NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”87 In 1977, the FPC became FERC after Congress passed the Department of Energy Organization Act. By the 1930s, regulated electric utilities that provided the major components of the electrical system - generation, transmission, and distribution - were common.88 These regulated monopolies are referred to as vertically-integrated utilities. As utilities built larger and larger electric generation plants, the cost per unit to generate electricity decreased.89","cited_authors":"NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”87 In","cited_year":"1977","cited_title":"the FPC became FERC after Congress passed the Department of Energy Organization Act","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830810,"raw_reference":"Press, at 159 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 158 of 1638 components to industrial, business, and residential consumers. Unlike other industries where sources make operational decisions independently, the utility power sector is unique in that electricity system resources operate in a complex, interconnected grid system that is physically interconnected and operated on an integrated basis across large regions.","cited_authors":"Press, at 159 (2d ed","cited_year":"2010","cited_title":"*** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 158 of 1638 components to industrial, business, and residential consumers","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830811,"raw_reference":"Systems, IEEE Press, at 159 (2d ed. 2010). 114 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"Systems, IEEE Press, at 159 (2d ed","cited_year":"2010","cited_title":"114 Casazza, J. and Delea, F., Understanding Electric Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830812,"raw_reference":"Today, federal, state, and local entities regulate electricity providers.116 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”117 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that (stating that “any electricity that enters the grid immediately becomes a part of a vast pool of energy that is constantly moving in interstate commerce.”) (citation omitted). In Federal Power Comm’n v. Southern California Edison Co., 376 U.S. 205 (1964), the Supreme Court found that a sale for resale of electricity from Southern California Edison to the City of","cited_authors":"Today, federal, state, and local entities regulate electricity providers.116 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”117 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that (stating that “any electricity that enters the grid immediately becomes a part of a vast pool of energy that is constantly moving in interstate commerce.”) (citation omitted). In Federal Power Comm’n v. Southern California Edison Co., 376 U.S. 205","cited_year":"1964","cited_title":"the Supreme Court found that a sale for resale of electricity from Southern California Edison to the City of","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830813,"raw_reference":"Colton, which took place solely in California, was under Federal Power Commission jurisdiction because some of the electricity that Southern California Edison marketed came from out of state. The Supreme Court stated that, “`federal jurisdiction was to follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id. at 210 (quoting Connecticut Light & Power Co. v. Federal Power Commission, 324 U.S. 515, 529 (1945) (emphasis omitted)).","cited_authors":"Colton, which took place solely in California, was under Federal Power Commission jurisdiction because some of the electricity that Southern California Edison marketed came from out of state. The Supreme Court stated that, “`federal jurisdiction was to follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id. at 210 (quoting Connecticut Light & Power Co. v. Federal Power Commission, 324 U.S. 515, 529","cited_year":"1945","cited_title":"(emphasis omitted))","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830814,"raw_reference":"Systems, IEEE Press, at 213 (2d ed. 2010). Formatted: Font: (Default) Courier New *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 161 of 1638 Formatted: Font: (Default) Courier New electricity are privately owned.118 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct 2005, the federal government’s role in electricity regulation greatly increased.119 “The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry.”120 2. Electric system dispatch System operators typically dispatch the electric system through a process known as Security Constrained Economic Deleted: economic dispatch. Dispatch.121 Security Constrained Economic Dispatch has two Deleted: dispatch components – economic generation of generation facilities and ensuring that the electric system remains reliable.122 Deleted: been defined as “the operation Deleted: to produce energy at the lowest cost to reliably serve consumers, recognizing any operational limits of generation Deleted: transmission facilities.”","cited_authors":"Systems, IEEE Press, at 213 (2d ed","cited_year":"2010","cited_title":"The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830815,"raw_reference":"Systems, IEEE Press, at 214 (2d ed. 2010). 121 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic","cited_authors":"Systems, IEEE Press, at 214 (2d ed","cited_year":"2010","cited_title":"121 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830816,"raw_reference":"NERC, at 2 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 128 North American Electric Reliability Corporation, History of","cited_authors":"NERC, at 2","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830817,"raw_reference":"NERC, at 4 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 129 North American Electric Reliability Corporation, History of","cited_authors":"NERC, at 4","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830818,"raw_reference":"NERC, at 3 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. Deleted: ¶ . The North American Electric Reliability Council became the North American Electric Reliability Corporation in 2007. Id. at 4. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 165 of 1638 Formatted: Font: (Default) Courier New impacting an area with an estimated 50 million people and 61,800 megawatts of electric load.130 The U.S. and Canada formed a joint task force to investigate the causes of the blackout and made recommendations to avoid similar outages in the future. One of the task force’s major recommendations was that the U.S. Congress should pass legislation making electric reliability standards mandatory and enforceable.131 Congress responded to this recommendation in EPAct 2005, adding a new section 215 to the Federal Power Act making reliability standards mandatory and enforceable and authorizing the creation of a new Electric Reliability Organization (ERO). Under this new system, FERC certifies an entity as the ERO. The","cited_authors":"NERC, at 3","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830819,"raw_reference":"ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so 130 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 1 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. The outage impacted areas within Ohio, Michigan, Pennsylvania, New York, Vermont,","cited_authors":"ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so 130 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 1 (Apr","cited_year":"2004","cited_title":"available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830820,"raw_reference":"Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 131 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. Deleted: *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 166 of 1638 independently.132 In 2006, the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.133 “NERC develops and enforces Reliability Standards; monitors the Bulk-Power System; assesses adequacy annually via a 10-year forecast and winter and summer forecasts; audits owners, operators and users for preparedness; and educates and trains industry personnel.”134 The United States, Canada, and part of Mexico are divided up into eight reliability regional entities.135 These regional entities include Florida Reliability Coordinating Council (FRCC), Midwest Reliability Organization (MRO), Northeast Power Coordinating Council (NPCC), Reliability First Corporation (RFC), SERC Reliability Corporation (SERC), Southwest Power","cited_authors":"Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 131 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr","cited_year":"2004","cited_title":"NERC develops and enforces Reliability Standards; monitors the Bulk-Power System; assesses adequacy annually via a 10-year forecast and winter and summer forecasts; audits owners, operators and users for preparedness; and educates and trains industry personnel","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830821,"raw_reference":"Pool, RE (SPP), Texas Reliability Entity (TRE), and Western Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 118 FERC ¶ 61,218, at P 3 (2007) (citing 16","cited_authors":"Pool, RE (SPP), Texas Reliability Entity (TRE), and Western Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 118 FERC ¶ 61,218, at P 3","cited_year":"2007","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830822,"raw_reference":"RPS or similar laws.158 Use of RE continues to grow rapidly in the U.S. In 2013, electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.160 In 2013, U.S. non-","cited_authors":"RPS or similar laws.158 Use of RE continues to grow rapidly in the U.S. In","cited_year":"2013","cited_title":"electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.160 In 2013, U.S. non-","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830823,"raw_reference":"Systems, IEEE Press, at 220-221 (2d ed. 2010). 156 Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam. Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010). 157 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"Systems, IEEE Press, at 220-221 (2d ed","cited_year":"2010","cited_title":"156 Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830824,"raw_reference":"Systems, IEEE Press, at 220-221 (2d ed. 2010). 158 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015). 160 Energy Information Administration, Annual Energy Outlook 2015 with Projections to 2040, at ES-6 (2014) and Energy Information","cited_authors":"Systems, IEEE Press, at 220-221 (2d ed","cited_year":"2010","cited_title":"158 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015)","cited_venue":null,"cited_doi":null,"cited_url":"http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830825,"raw_reference":"Administration, Monthly Energy Review, May 2015, Table 7.2b, Deleted: .159 Total *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 175 of 1638 Formatted: Font: (Default) Courier New hydro RE capacity for the total electric power industry exceeded Deleted: was approximately 13,000 megawatts (MW) in 1998. In 2013, 80,000 MW, reflecting a fivefold increase in just 15 years.161 In Deleted: capacity was over five times higher with particular, there has been substantial growth in the wind and Deleted: of non-hydro RE capacity photovoltaic (PV) markets in the past decade. Since 2009, U.S. wind generation has tripled and solar generation has grown twenty-fold.162 Deleted: energy Deleted: capacity The global market for RE is projected to grow to $460 billion per year by 2030.163 RE growth is further encouraged by the significant amount of existing natural resources that can support RE production in the United States.164 In the Energy Deleted: (solar, water, wind, and geothermal) Information Administration’s Annual Energy Outlook 2015, RE generation grows substantially from 2013 to 2040 in the available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf. 161 Non-hydro RE capacity for the total electric power industry was more than 16,000 megawatts (MW) in 1998. Energy Information","cited_authors":"Administration, Monthly Energy Review, May","cited_year":"2015","cited_title":"Table 7.2b, Deleted: .159 Total *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 175 of 1638 Formatted: Font: (Default) Courier New hydro RE capacity for the total electric power industry exceeded Deleted: was approximately 13,000 megawatts (MW) in 1998","cited_venue":null,"cited_doi":null,"cited_url":"http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830826,"raw_reference":"Administration, 1990-2013 Existing Nameplate and Net Summer Capacity by Energy Source Producer Type and State (EIA-860), available at http://www.eia.gov/electricity/data/state/. 162 Energy Information Administration, Monthly Energy Review, May 2015, Table 7.2b, available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf. “Global Renewable Energy Market Outlook.” Bloomberg New Energy Finance (Nov. 16, 2011), available at http://bnef.com/WhitePapers/download/53. Lopez et al., NREL, ‘‘U.S. Renewable Energy Technical Potentials: A GIS-Based Analysis,’’ (July 2012). Deleted: Barbose, G., Renewables Portfolio Standards in the United States: A Status","cited_authors":"Administration, 1990-2013 Existing Nameplate and Net Summer Capacity by Energy Source Producer Type and State (EIA-860), available at http://www.eia.gov/electricity/data/state/. 162 Energy Information Administration, Monthly Energy Review, May","cited_year":"2015","cited_title":"Global Renewable Energy Market Outlook","cited_venue":null,"cited_doi":null,"cited_url":"http://www.eia.gov/electricity/data/state/","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830827,"raw_reference":"CAA section 110(a)(2)(D)(i)(I), the “Good Neighbor Provision,” requires state implementation plans (SIPs) to prohibit emissions that “contribute significantly to nonattainment . . . or interfere with maintenance” of the NAAQS in any other state.180 If the EPA finds that a state has failed to submit an approvable SIP, the EPA must issue a federal implementation plan (FIP) to prohibit those emissions “at any time” within the next two years.181 42 U.S.C. § 7651g. Such plans may simply state that the owner or operator expects to hold sufficient allowances or, in the case of alternative compliance methods, must provide a “comprehensive description of the schedule and means by which the unit will rely on one or more alternative methods of compliance in the manner and time authorized under [Title IV].” 42 U.S.C. § 7651g(b). 180 42 U.S.C. § 7410(a)(2)(D)(i)(I). 181 EPA v. EME Homer City Generation, L.P., 134 S. Ct. 1584, 1600–01 (2014) (citing 42 U.S.C. § 7410(c)). Formatted: Font: (Default) Courier New *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 181 of 1638 In three major rulemakings — the NOx SIP Call,182 the Clean Air Interstate Rule (CAIR),183 and the Cross State Air Pollution Rule (CSAPR)184 — the EPA has attempted to delineate the scope of the Good Neighbor Provision. These rulemakings have several features in common. Although the Good Neighbor Provision does not speak specifically about EGUs, in all three rulemakings, the","cited_authors":"CAA section 110(a)(2)(D)(i)(I), the “Good Neighbor Provision,” requires state implementation plans (SIPs) to prohibit emissions that “contribute significantly to nonattainment . . . or interfere with maintenance” of the NAAQS in any other state.180 If the EPA finds that a state has failed to submit an approvable SIP, the EPA must issue a federal implementation plan (FIP) to prohibit those emissions “at any time” within the next two years.181 42 U.S.C. § 7651g. Such plans may simply state that the owner or operator expects to hold sufficient allowances or, in the case of alternative compliance methods, must provide a “comprehensive description of the schedule and means by which the unit will rely on one or more alternative methods of compliance in the manner and time authorized under [Title IV].” 42 U.S.C. § 7651g(b). 180 42 U.S.C. § 7410(a)(2)(D)(i)(I). 181 EPA v. EME Homer City Generation, L.P., 134 S. Ct. 1584, 1600–01","cited_year":"2014","cited_title":"(citing 42 U.S.C. § 7410(c))","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830828,"raw_reference":"EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In 1998, the EPA promulgated the NOx SIP Call, which required 23 upwind states to reduce emissions of NOx that would impact downwind areas with ozone problems. The EPA determined emission reduction requirements based on reductions achievable through “highly cost-effective” controls—i.e., controls that would cost on average no more than $2,000 per ton of emissions reduced.185 The EPA determined that a uniform","cited_authors":"EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In","cited_year":"1998","cited_title":"highly cost-effective","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830829,"raw_reference":"http://journals.ametsoc.org/doi/pdf/10.1175/2008BAMS2370.1.","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":"10.1175/2008bams2370.1","cited_url":"http://journals.ametsoc.org/doi/pdf/10.1175/2008BAMS2370.1","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830830,"raw_reference":"http://www.oxfordreference.com.mutex.gmu.edu/view/10.1093/acref/","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":"10.1093/acref/","cited_url":"http://www.oxfordreference.com.mutex.gmu.edu/view/10.1093/acref/","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}