{"document":{"doc_id":130623,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of revised CPP final rule package (2060-AR33) (7/29/2015)","date":"2015-10-23","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2013-0602-36785","source_native_id":"EPA-HQ-OAR-2013-0602-36785","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2013-0602"],"rins":["RIN 2060-AR33","RIN 2060-AR88"],"related":[{"doc_id":11531,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units","date":"2014-06-18"},{"doc_id":48268,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"RIA for the Final Revisions to the National Ambient Air Quality Standards for Particulate Matter; 2012 [EPA-452/R-12-005]","date":"2014-06-18"},{"doc_id":48280,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Proposed Carbon Pollution Guidelines for Existing Power Plants and Emission Standards for Modified and Reconstructed Power Plants - June 2014 [EPA -542/R-14-002]","date":"2014-06-18"},{"doc_id":48295,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"2008 Ozone NAAQS RIA Benefits Chapter","date":"2014-06-18"},{"doc_id":48334,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Email to OMB - Revisions to Chapter 9 of RIA (May 23, 2014)","date":"2014-06-18"},{"doc_id":48380,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding organization of meetings on the EGU GHG Existing Source NPRM for a legal discussion and RIA briefing (2060-AR33) (4/10/2014)","date":"2014-06-18"},{"doc_id":48386,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding a meeting on the EGU GHG Existing Source NPRM RIA results compared to EIA and RFF projections (2060-AR33) (4/24/2014)","date":"2014-06-18"},{"doc_id":48402,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (single document) (2060-AR33) (5/28/2014)","date":"2014-06-18"},{"doc_id":48436,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Summary of the Updated Regulatory Impact Analysis (RIA) for the Reconsideration of the 2008 Ozone National Ambient Air Quality Standard (NAAQS); Section 3: Re-analysis of the Benefits of Attaining Alternative Ozone Standards to Incorporate Current Methods","date":"2014-06-18"},{"doc_id":48486,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA chapters (2060-AR33) (5/15/2014)","date":"2014-06-18"},{"doc_id":48840,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding a meeting on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/21/2014)","date":"2014-06-18"},{"doc_id":48854,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding Interagency request for EGU GHG Existing Source NPRM RIA IPM Output (2060-AR33) (4/17/2014)","date":"2014-06-18"},{"doc_id":48903,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA, Chapter 4 (2060-AR33) (5/26/2014)","date":"2014-06-18"},{"doc_id":48915,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request to combine the EGU GHG Existing Source NPRM RIA chapters into one single document (2060-AR33) (5/16/2014)","date":"2014-06-18"},{"doc_id":49770,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA and Alternative Renewable Energy (RE) Approach TSD (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":49781,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA, Chapter 8 (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":49797,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/24/2014)","date":"2014-06-18"},{"doc_id":49812,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding the EGU GHG Existing Source NPRM RIA (2060-AR33) (4/21/2014)","date":"2014-06-18"},{"doc_id":49825,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM Preamble and RIA (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":49843,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (Clean) (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":49893,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding EGU GHG Existing Source NPRM Building Blocks 1 and 2 Memo and RIA (2060-AR33) (5/21/2014)","date":"2014-06-18"},{"doc_id":49908,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":49942,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding a meeting on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/22/2014)","date":"2014-06-18"},{"doc_id":50036,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Proposed Carbon Pollution Guidelines for Existing Power Plants and Emission Standards for Modified and Reconstructed Power Plants [EPA -542/R-14-002]","date":"2014-06-18"},{"doc_id":50083,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Final Ozone NAAQS Regulatory Impact Analysis; Chapter 6: Incremental Benefits of Attaining Alternative Ozone Standards Relative to the Current 8-hour Standard (0.08 ppm)","date":"2014-06-18"},{"doc_id":50099,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (Redline and Clean) (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":50140,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for EGU GHG Existing Source NPRM RIA briefing and the 111(b) regulatory text TSD (2060-AR33) (4/18/2014)","date":"2014-06-18"},{"doc_id":50155,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/28/2014)","date":"2014-06-18"},{"doc_id":50171,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA, Executive Summary and Chapters 3 and 6 (2060-AR33) (5/29/2014)","date":"2014-06-18"},{"doc_id":50186,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Final Revisions to the National Ambient Air Quality Standards for Particulate Matter [EPA-452/R-12-005]","date":"2014-06-18"},{"doc_id":50249,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/25/2014)","date":"2014-06-18"},{"doc_id":50263,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA, Chapter 4 (2060-AR33) (5/28/2014)","date":"2014-06-18"},{"doc_id":50278,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/14/2014)","date":"2014-06-18"},{"doc_id":50326,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Memo: Emission Reductions, Costs, Benefits and Economic Impacts Associated with Buliding Blocks 1 and 2.","date":"2014-06-18"},{"doc_id":50349,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"California Standard Practice Manual: Economic Analysis of Demand-Side Programs and Projects","date":"2014-06-18"},{"doc_id":50394,"source":"ria","org":"EPA","doc_type":"benefit_cost_analysis","title":"Benefit-Cost Analysis in Environmental, Health, and Safety Regulation: A Statement of Principles","date":"2014-06-18"},{"doc_id":50413,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"LBNL Energy and Economic Impacts of U.S. Federal Energy and Water Conservation Standards Adopted From 1987 Through 2012","date":"2014-06-18"},{"doc_id":50417,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Memorandum: Emission Reductions, Costs, Benefits and Economic Impacts Associated with Building Blocks 1 & 2","date":"2014-06-18"},{"doc_id":131025,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Large\nPublic Power Council (2060-AR33) (4/17/2014)","date":"2014-06-18"},{"doc_id":131026,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of white paper from Pennsylvania Department of Environmental Protection under EO 12866 (2060-AR33) (4/10/2014)","date":"2014-06-18"},{"doc_id":131027,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the National Rural Electric Cooperative Association (2060-AR33) (4/17/2014)","date":"2014-06-18"},{"doc_id":131028,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the National Climate Coalition (2060-AR33) (4/29/2014)","date":"2014-06-18"},{"doc_id":131029,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Canadian Electricity Association (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131030,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with RePower South (2060-AR33) (4/29/2014)","date":"2014-06-18"},{"doc_id":131031,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Natural Resources Defense Council (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131032,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Association of Home Appliance Manufacturers (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131033,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with Sierra Club (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131034,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with Alevo (2060-AR33) (5/8/2014)","date":"2014-06-18"},{"doc_id":131035,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of white paper from Coalition for Innovative Climate Solutions under EO 12866 (2060-AR33) (4/9/2014)","date":"2014-06-18"},{"doc_id":131036,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Coalition for Innovative Climate Solutions (2060-AR33) (4/11/2014)","date":"2014-06-18"},{"doc_id":131037,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with Waste Management (2060-AR33) (5/2/2014)","date":"2014-06-18"},{"doc_id":131038,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for multiple TSDs on the EGU GHG Existing Source NPRM (2060-AR33) (5/29/2014)","date":"2014-06-18"},{"doc_id":131039,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for Alternative Renewable Energy (RE) Approach TSD on the EGU GHG Existing Source NPRM (2060-AR33) (5/29/2014)","date":"2014-06-18"},{"doc_id":131040,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding Interagency Comments on the EGU GHG Existing Source NPRM GHG Abatement TSD, Chapter 5 (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":131041,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding scheduling a meeting to discuss Interagency Comments on the EGU GHG Existing Source NPRM (2060-AR33) (5/30/2014)","date":"2014-06-18"},{"doc_id":131042,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding organization of a meeting on the EGU GHG Existing Source NPRM with DOJ (2060-AR33) (4/17/2014)","date":"2014-06-18"},{"doc_id":131043,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 and 13563 review - EGU GHG Existing Source NPRM","date":"2014-06-18"},{"doc_id":131044,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Documentation of Changes Made During OMB Review Under E.O. 12866 and 13563 through May 28, 2014 - EGU GHG Existing Source NPRM","date":"2014-06-18"},{"doc_id":131045,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for EGU GHG Existing Source NPRM Survey of Existing State Policies and Programs (2060-AR33) (4/4/2014)","date":"2014-06-18"},{"doc_id":131046,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Discussion regarding status of briefing materials for the overview briefing on the EGU GHG Existing Source NPRM (2060-AR33) (4/7/2014)","date":"2014-06-18"}],"references":[{"citation_id":830738,"raw_reference":"Systems, IEEE Press, at 2-4 (2d ed. 2010). 67 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"Systems, IEEE Press, at 2-4 (2d ed","cited_year":"2010","cited_title":"67 Casazza, J. and Delea, F., Understanding Electric Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830739,"raw_reference":"Systems, IEEE Press, at 5-6 (2d ed. 2010). Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs. If these costs can be spread to more customers, then this can reduce the amount that each individual customer pays. Federal Energy Regulatory Commission, Energy Primer: A Handbook of Energy Market Basics, at 38 (2012), available at http://www.ferc.gov/market-oversight/guide/energy-primer.pdf. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 148 of 1592 systems with federal regulation coming later in response to public concerns about rising electricity costs.68","cited_authors":"Systems, IEEE Press, at 5-6 (2d ed","cited_year":"2010","cited_title":"Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ferc.gov/market-oversight/guide/energy-primer.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830740,"raw_reference":"Initially, states had broad authority to regulate public utilities, but gradually federal regulation increased. In 1920, Congress passed the Federal Water Power Act, creating the Federal Power Commission (FPC) and providing for the licensing of hydroelectric facilities on U.S. government lands and navigable waters of the U.S.69 During this time period, the U.S. Supreme Court found that state authority to regulate public utilities is limited, holding that the Commerce Clause does not allow state regulation to directly burden interstate commerce.70 For example, in Public Utilities Commission of Rhode Island v. Attleboro Steam & Electric Company, Rhode Island sought to regulate the electricity rates that a Rhode Island generator was charging to a company in Massachusetts that resold the electricity to Attleboro, Massachusetts.71 The Supreme Court found that Rhode Island’s regulation was impermissible because","cited_authors":"Initially, states had broad authority to regulate public utilities, but gradually federal regulation increased. In","cited_year":"1920","cited_title":"Congress passed the Federal Water Power Act, creating the Federal Power Commission (FPC) and providing for the licensing of hydroelectric facilities on U.S. government lands and navigable waters of the U.S.69 During this time period, the U.S. Supreme Court found that state authority to regulate public utilities is limited, holding that the Commerce Clause does not allow state regulation to directly burden interstate commerce.70 For example, in Public Utilities Commission of Rhode Island v","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830741,"raw_reference":"NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”77 In 1977, the FPC became FERC after Congress passed the Department of Energy Organization Act. By the 1930s, regulated electric utilities that provided the major components of the electrical system - generation, transmission, and distribution - were common.78 These regulated monopolies are referred to as vertically-integrated utilities. As utilities built larger and larger electric generation plants, the cost per unit to generate electricity decreased.79","cited_authors":"NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”77 In","cited_year":"1977","cited_title":"the FPC became FERC after Congress passed the Department of Energy Organization Act","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830742,"raw_reference":"Systems, IEEE Press, at 159 (2d ed. 2010). 104 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"Systems, IEEE Press, at 159 (2d ed","cited_year":"2010","cited_title":"104 Casazza, J. and Delea, F., Understanding Electric Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830743,"raw_reference":"Today, federal, state, and local entities regulate electricity providers.106 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”107 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that electricity are privately owned.108 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct 2005, the federal government’s role in follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id. at 210 (quoting Connecticut Light & Power Co. v. Federal Power Commission, 324 U.S. 515, 529 (1945) (emphasis omitted)).","cited_authors":"Today, federal, state, and local entities regulate electricity providers.106 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”107 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that electricity are privately owned.108 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct","cited_year":"2005","cited_title":"the federal government’s role in follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830744,"raw_reference":"Systems, IEEE Press, at 214 (2d ed. 2010).","cited_authors":"Systems, IEEE Press, at 214 (2d ed","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830745,"raw_reference":"Systems, IEEE Press, at 213 (2d ed. 2010).","cited_authors":"Systems, IEEE Press, at 213 (2d ed","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830746,"raw_reference":"Systems, IEEE Press, at 213 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 160 of 1592 electricity regulation greatly increased.109 “The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry.”110 2. Electric system dispatch System operators typically dispatch the electric system through a process known as Security Constrained Economic Dispatch.111 Security Constrained Economic Dispatch has two components – economic generation of generation facilities and ensuring that the electric system remains reliable.112 Electricity demand varies across geography and time in response to numerous conditions, such that electric generators are constantly responding to changes in the most reliable and cost109","cited_authors":"Systems, IEEE Press, at 213 (2d ed","cited_year":"2010","cited_title":"The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830747,"raw_reference":"Systems, IEEE Press, at 214 (2d ed. 2010). 111 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic","cited_authors":"Systems, IEEE Press, at 214 (2d ed","cited_year":"2010","cited_title":"111 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830748,"raw_reference":"Ontario, Canada experienced the largest power blackout to date, impacting 30 million people.115 In response to the 1965 blackout and a Federal Power Commission recommendation,116 industry North American Electric Reliability Corporation, History of","cited_authors":null,"cited_year":null,"cited_title":"Ontario, Canada experienced the largest power blackout to date, impacting 30 million people.115 In response to the 1965 blackout and a Federal Power Commission recommendation,116 industry North American Electric Reliability Corporation, History of","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830749,"raw_reference":"NERC, at 2 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 118 North American Electric Reliability Corporation, History of","cited_authors":"NERC, at 2","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830750,"raw_reference":"NERC, at 4 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 119 North American Electric Reliability Corporation, History of","cited_authors":"NERC, at 4","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830751,"raw_reference":"NERC, at 3 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 120 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 1 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. The outage impacted areas within Ohio, Michigan, Pennsylvania, New York, Vermont, *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 164 of 1592 task force to investigate the causes of the blackout and made recommendations to avoid similar outages in the future. One of the task force’s major recommendations was that the U.S. Congress should pass legislation making electric reliability standards mandatory and enforceable.121 Congress responded to this recommendation in EPAct 2005, adding a new section 215 to the Federal Power Act making reliability standards mandatory and enforceable and authorizing the creation of a new Electric Reliability Organization (ERO). Under this new system, FERC certifies an entity as the ERO. The","cited_authors":"NERC, at 3","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830752,"raw_reference":"ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so independently.122 In 2006, the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.123 “NERC develops","cited_authors":"ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so independently.122 In","cited_year":"2006","cited_title":"the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.123 “NERC develops","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830753,"raw_reference":"Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 121 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. 122 Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 118 FERC ¶ 61,218, at P 3 (2007) (citing 16","cited_authors":"Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 121 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr","cited_year":"2004","cited_title":"available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830754,"raw_reference":"Sustainable Energy, 2015 Factbook: Sustainable Energy in","cited_authors":null,"cited_year":null,"cited_title":"Sustainable Energy, 2015 Factbook: Sustainable Energy in","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830755,"raw_reference":"Systems, IEEE Press, at 220-221 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 173 of 1592 facilities145 or small generation resources that use renewables such as wind, solar, biomass, geothermal, or hydroelectric power as their primary fuels.146 Through PURPA, Congress supported the development of more renewable energy generation in the U.S. States have also taken a significant lead in requiring the development of renewable resources. In particular, a number of states have adopted renewable portfolio standards (RPS). As of 2013, 29 states and the District of Columbia have enforceable","cited_authors":"Systems, IEEE Press, at 220-221 (2d ed","cited_year":"2010","cited_title":"*** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 173 of 1592 facilities145 or small generation resources that use renewables such as wind, solar, biomass, geothermal, or hydroelectric power as their primary fuels.146 Through PURPA, Congress supported the development of more renewable energy generation in the U.S. States have also taken a significant lead in requiring the development of renewable resources","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830756,"raw_reference":"RPS or similar laws.147 Use of RE continues to grow rapidly in the U.S. In 2013, electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.148 In 2013, U.S. nonhydro RE capacity for the total electric power industry exceeded Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam. Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010). 146 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"RPS or similar laws.147 Use of RE continues to grow rapidly in the U.S. In","cited_year":"2013","cited_title":"electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.148 In 2013, U.S. nonhydro RE capacity for the total electric power industry exceeded Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830757,"raw_reference":"Systems, IEEE Press, at 220-221 (2d ed. 2010). 147 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015). 148 Energy Information Administration, Annual Energy Outlook 2015 with Projections to 2040, at ES-6 (2014) and Energy Information","cited_authors":"Systems, IEEE Press, at 220-221 (2d ed","cited_year":"2010","cited_title":"147 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015)","cited_venue":null,"cited_doi":null,"cited_url":"http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830758,"raw_reference":"Administration, Monthly Energy Review, May 2015, Table 7.2b, available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 174 of 1592 80,000 MW, reflecting a fivefold increase in just 15 years.149 In particular, there has been substantial growth in the wind and photovoltaic (PV) markets in the past decade. Since 2009, U.S. wind generation has tripled and solar generation has grown twenty-fold.150 The global market for RE is projected to grow to $460 billion per year by 2030.151 RE growth is further encouraged by the significant amount of existing natural resources that can support RE production in the United States.152 In the Energy Information Administration’s Annual Energy Outlook 2015, RE generation grows substantially from 2013 to 2040 in the reference case and all alternative cases.153 In the reference case, RE generation increases by more than 70 percent from 2013 Non-hydro RE capacity for the total electric power industry was more than 16,000 megawatts (MW) in 1998. Energy Information","cited_authors":"Administration, Monthly Energy Review, May","cited_year":"2015","cited_title":"Table 7.2b, available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830759,"raw_reference":"EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In 1998, the EPA promulgated the NOx SIP Call, which required 23 upwind states to reduce emissions of NOx that would impact downwind areas with ozone problems. The EPA determined emission reduction requirements based on reductions achievable through “highly cost-effective” controls—i.e., controls that would cost on average no more than $2,000 per ton of emissions reduced.173 The EPA determined that a uniform emission rate on large EGUs coupled with a cap-and-trade program was one such set of highly cost-effective controls.174","cited_authors":"EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In","cited_year":"1998","cited_title":"highly cost-effective","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830760,"raw_reference":"The D.C. Circuit upheld the NOx SIP Call 63 FR at 57377–78. 63 FR at 57377–78. In addition to EGUs, the NOx SIP Call also set budgets based on highly cost-effective emission reductions from certain other large sources. Id. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 181 of 1592 in most significant respects, including its use of costs to apportion emission reduction responsibilities.175 b. Clean Air Interstate Rule (CAIR). In 2005, the EPA promulgated CAIR, which required 28 upwind states to reduce emissions of NOx and SO2 that would impact downwind areas with projected nonattainment and maintenance problems for ozone and PM2.5. The EPA determined emission reduction requirements based on “controls that are known to be highly cost effective for EGUs.”176 The EPA established cap-and-trade programs for sources of NOx and SO2 in states that chose to participate in the trading programs via their SIPs and for states ultimately subject to a","cited_authors":"The D.C. Circuit upheld the NOx SIP Call 63 FR at 57377–78. 63 FR at 57377–78. In addition to EGUs, the NOx SIP Call also set budgets based on highly cost-effective emission reductions from certain other large sources. Id. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 181 of 1592 in most significant respects, including its use of costs to apportion emission reduction responsibilities.175 b. Clean Air Interstate Rule (CAIR). In","cited_year":"2005","cited_title":"controls that are known to be highly cost effective for EGUs","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830761,"raw_reference":"MATS rule are required to comply by April 16, 2012 or upon startup, whichever is later. Existing sources subject to the MATS rule were required to begin meeting the rule’s requirements on April 16, 2015. Controls that will achieve the MATS performance standards are being installed on many units. Certain units, especially those that operate infrequently, may be considered not worth investing in given today’s electricity market, and are closing. The final","cited_authors":"MATS rule are required to comply by April 16, 2012 or upon startup, whichever is later. Existing sources subject to the MATS rule were required to begin meeting the rule’s requirements on April 16","cited_year":"2015","cited_title":"Controls that will achieve the MATS performance standards are being installed on many units","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830762,"raw_reference":"Lead, another NAAQS pollutant, is emitted in the amounts of approximately 1,000 tons per year, and, in light of that relatively small quantity, was excluded from this analysis. Ammonia (NH3) is included because it is a precursor to PM2.5 secondary formation. Note that one short ton is equivalent to 0.907185 metric ton. 59 In addition, emissions of non-CO GHGs totaled 1.168 billion metric tons of carbon-dioxide equivalents (CO2e) in 2013. See Table ES-2, Executive Summary, 1990-2013 Inventory of U.S. Greenhouse Gas Emissions and Sinks. http://www.epa.gov/climatechange/Downloads/ghgemissions/US-GHGInventory-2015-Chapter-Executive-Summary.pdf Deleted: ¶","cited_authors":"Lead, another NAAQS pollutant, is emitted in the amounts of approximately 1,000 tons per year, and, in light of that relatively small quantity, was excluded from this analysis. Ammonia (NH3) is included because it is a precursor to PM2.5 secondary formation. Note that one short ton is equivalent to 0.907185 metric ton. 59 In addition, emissions of non-CO GHGs totaled 1.168 billion metric tons of carbon-dioxide equivalents (CO2e) in","cited_year":"2013","cited_title":"See Table ES-2, Executive Summary, 1990-2013 Inventory of U.S. Greenhouse Gas Emissions and Sinks","cited_venue":null,"cited_doi":null,"cited_url":"http://www.epa.gov/climatechange/Downloads/ghgemissions/US-GHGInventory-2015-Chapter-Executive-Summary.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830763,"raw_reference":"Systems, IEEE Press, at 2-4 (2d ed. 2010). 68 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"Systems, IEEE Press, at 2-4 (2d ed","cited_year":"2010","cited_title":"68 Casazza, J. and Delea, F., Understanding Electric Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830764,"raw_reference":"Systems, IEEE Press, at 5-6 (2d ed. 2010). Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs. If these costs can be spread to more customers, then this can reduce the amount that each individual customer pays. Federal Energy Regulatory Commission, Energy Primer: A Handbook *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 148 of 1592 governments initially regulated these growing electricity systems with federal regulation coming later in response to public concerns about rising electricity costs.69","cited_authors":"Systems, IEEE Press, at 5-6 (2d ed","cited_year":"2010","cited_title":"Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830765,"raw_reference":"NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”78 In 1977, the FPC became FERC after Congress passed the Department of Energy Organization Act. By the 1930s, regulated electric utilities that provided the major components of the electrical system - generation, transmission, and distribution - were common.79 These regulated monopolies are referred to as vertically-integrated utilities. As utilities built larger and larger electric generation plants, the cost per unit to generate electricity decreased.80","cited_authors":"NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”78 In","cited_year":"1977","cited_title":"the FPC became FERC after Congress passed the Department of Energy Organization Act","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830766,"raw_reference":"Systems, IEEE Press, at 159 (2d ed. 2010). 105 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"Systems, IEEE Press, at 159 (2d ed","cited_year":"2010","cited_title":"105 Casazza, J. and Delea, F., Understanding Electric Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830767,"raw_reference":"Today, federal, state, and local entities regulate electricity providers.107 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”108 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that electricity are privately owned.109 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct 2005, the federal government’s role in follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id. at 210 (quoting Connecticut Light & Power Co. v. Federal Power Commission, 324 U.S. 515, 529 (1945) (emphasis omitted)).","cited_authors":"Today, federal, state, and local entities regulate electricity providers.107 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”108 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that electricity are privately owned.109 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct","cited_year":"2005","cited_title":"the federal government’s role in follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830768,"raw_reference":"Systems, IEEE Press, at 213 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 160 of 1592 electricity regulation greatly increased.110 “The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry.”111 2. Electric system dispatch System operators typically dispatch the electric system through a process known as Security Constrained Economic Dispatch.112 Security Constrained Economic Dispatch has two components – economic generation of generation facilities and ensuring that the electric system remains reliable.113 Electricity demand varies across geography and time in response to numerous conditions, such that electric generators are constantly responding to changes in the most reliable and cost110","cited_authors":"Systems, IEEE Press, at 213 (2d ed","cited_year":"2010","cited_title":"The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830769,"raw_reference":"Systems, IEEE Press, at 214 (2d ed. 2010). 112 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic","cited_authors":"Systems, IEEE Press, at 214 (2d ed","cited_year":"2010","cited_title":"112 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830770,"raw_reference":"Ontario, Canada experienced the largest power blackout to date, impacting 30 million people.116 In response to the 1965 blackout and a Federal Power Commission recommendation,117 industry North American Electric Reliability Corporation, History of","cited_authors":null,"cited_year":null,"cited_title":"Ontario, Canada experienced the largest power blackout to date, impacting 30 million people.116 In response to the 1965 blackout and a Federal Power Commission recommendation,117 industry North American Electric Reliability Corporation, History of","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830771,"raw_reference":"NERC, at 2 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 119 North American Electric Reliability Corporation, History of","cited_authors":"NERC, at 2","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830772,"raw_reference":"NERC, at 4 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 120 North American Electric Reliability Corporation, History of","cited_authors":"NERC, at 4","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830773,"raw_reference":"NERC, at 3 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 121 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 1 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. The outage impacted areas within Ohio, Michigan, Pennsylvania, New York, Vermont, *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 164 of 1592 task force to investigate the causes of the blackout and made recommendations to avoid similar outages in the future. One of the task force’s major recommendations was that the U.S. Congress should pass legislation making electric reliability standards mandatory and enforceable.122 Congress responded to this recommendation in EPAct 2005, adding a new section 215 to the Federal Power Act making reliability standards mandatory and enforceable and authorizing the creation of a new Electric Reliability Organization (ERO). Under this new system, FERC certifies an entity as the ERO. The","cited_authors":"NERC, at 3","cited_year":"2013","cited_title":"available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830774,"raw_reference":"ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so independently.123 In 2006, the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.124 “NERC develops","cited_authors":"ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so independently.123 In","cited_year":"2006","cited_title":"the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.124 “NERC develops","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830775,"raw_reference":"Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 122 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. 123 Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 118 FERC ¶ 61,218, at P 3 (2007) (citing 16","cited_authors":"Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 122 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr","cited_year":"2004","cited_title":"available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830776,"raw_reference":"Systems, IEEE Press, at 220-221 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 173 of 1592 facilities146 or small generation resources that use renewables such as wind, solar, biomass, geothermal, or hydroelectric power as their primary fuels.147 Through PURPA, Congress supported the development of more renewable energy generation in the U.S. States have also taken a significant lead in requiring the development of renewable resources. In particular, a number of states have adopted renewable portfolio standards (RPS). As of 2013, 29 states and the District of Columbia have enforceable","cited_authors":"Systems, IEEE Press, at 220-221 (2d ed","cited_year":"2010","cited_title":"*** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 173 of 1592 facilities146 or small generation resources that use renewables such as wind, solar, biomass, geothermal, or hydroelectric power as their primary fuels.147 Through PURPA, Congress supported the development of more renewable energy generation in the U.S. States have also taken a significant lead in requiring the development of renewable resources","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830777,"raw_reference":"RPS or similar laws.148 Use of RE continues to grow rapidly in the U.S. In 2013, electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.149 In 2013, U.S. nonhydro RE capacity for the total electric power industry exceeded Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam. Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010). 147 Casazza, J. and Delea, F., Understanding Electric Power","cited_authors":"RPS or similar laws.148 Use of RE continues to grow rapidly in the U.S. In","cited_year":"2013","cited_title":"electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.149 In 2013, U.S. nonhydro RE capacity for the total electric power industry exceeded Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830778,"raw_reference":"Systems, IEEE Press, at 220-221 (2d ed. 2010). 148 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015). 149 Energy Information Administration, Annual Energy Outlook 2015 with Projections to 2040, at ES-6 (2014) and Energy Information","cited_authors":"Systems, IEEE Press, at 220-221 (2d ed","cited_year":"2010","cited_title":"148 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015)","cited_venue":null,"cited_doi":null,"cited_url":"http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830779,"raw_reference":"Administration, Monthly Energy Review, May 2015, Table 7.2b, available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 174 of 1592 80,000 MW, reflecting a fivefold increase in just 15 years.150 In particular, there has been substantial growth in the wind and photovoltaic (PV) markets in the past decade. Since 2009, U.S. wind generation has tripled and solar generation has grown twenty-fold.151 The global market for RE is projected to grow to $460 billion per year by 2030.152 RE growth is further encouraged by the significant amount of existing natural resources that can support RE production in the United States.153 In the Energy Information Administration’s Annual Energy Outlook 2015, RE generation grows substantially from 2013 to 2040 in the reference case and all alternative cases.154 In the reference case, RE generation increases by more than 70 percent from 2013 Non-hydro RE capacity for the total electric power industry was more than 16,000 megawatts (MW) in 1998. Energy Information","cited_authors":"Administration, Monthly Energy Review, May","cited_year":"2015","cited_title":"Table 7.2b, available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf","cited_venue":null,"cited_doi":null,"cited_url":"http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830780,"raw_reference":"EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In 1998, the EPA promulgated the NOx SIP Call, which required 23 upwind states to reduce emissions of NOx that would impact downwind areas with ozone problems. The EPA determined emission reduction requirements based on reductions achievable through “highly cost-effective” controls—i.e., controls that would cost on average no more than $2,000 per ton of emissions reduced.174 The EPA determined that a uniform emission rate on large EGUs coupled with a cap-and-trade program was one such set of highly cost-effective controls.175","cited_authors":"EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In","cited_year":"1998","cited_title":"highly cost-effective","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830781,"raw_reference":"The D.C. Circuit upheld the NOx SIP Call 63 FR at 57377–78. 63 FR at 57377–78. In addition to EGUs, the NOx SIP Call also set budgets based on highly cost-effective emission reductions from certain other large sources. Id. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 181 of 1592 in most significant respects, including its use of costs to apportion emission reduction responsibilities.176 b. Clean Air Interstate Rule (CAIR). In 2005, the EPA promulgated CAIR, which required 28 upwind states to reduce emissions of NOx and SO2 that would impact downwind areas with projected nonattainment and maintenance problems for ozone and PM2.5. The EPA determined emission reduction requirements based on “controls that are known to be highly cost effective for EGUs.”177 The EPA established cap-and-trade programs for sources of NOx and SO2 in states that chose to participate in the trading programs via their SIPs and for states ultimately subject to a","cited_authors":"The D.C. Circuit upheld the NOx SIP Call 63 FR at 57377–78. 63 FR at 57377–78. In addition to EGUs, the NOx SIP Call also set budgets based on highly cost-effective emission reductions from certain other large sources. Id. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 181 of 1592 in most significant respects, including its use of costs to apportion emission reduction responsibilities.176 b. Clean Air Interstate Rule (CAIR). In","cited_year":"2005","cited_title":"controls that are known to be highly cost effective for EGUs","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":830782,"raw_reference":"http://journals.ametsoc.org/doi/pdf/10.1175/2008BAMS2370.1.","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":"10.1175/2008bams2370.1","cited_url":"http://journals.ametsoc.org/doi/pdf/10.1175/2008BAMS2370.1","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}