Part of E.O. 12866 and 13563 Review: Interagency Comments on the CPP draft final rule (2060-AR33) (7/30/2015)
Other documents for the same rulemaking
References: 26 extracted, 0 linked to papers
Systems, IEEE Press, at 2-4 (2d ed. 2010). 67 Casazza, J. and Delea, F., Understanding Electric Power
Systems, IEEE Press, at 5-6 (2d ed. 2010). Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs. If these costs can be spread to more customers, then this can reduce the amount that each individual customer pays. Federal Energy Regulatory Commission, Energy Primer: A Handbook *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 148 of 1596 governments initially regulated these growing electricity systems with federal regulation coming later in response to public concerns about rising electricity costs.68
NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”77 In 1977, the FPC became FERC after Congress passed the Department of Energy Organization Act. By the 1930s, regulated electric utilities that provided the major components of the electrical system - generation, transmission, and distribution - were common.78 These regulated monopolies are referred to as vertically-integrated utilities. As utilities built larger and larger electric generation plants, the cost per unit to generate electricity decreased.79
Systems, IEEE Press, at 159 (2d ed. 2010). 104 Casazza, J. and Delea, F., Understanding Electric Power
Today, federal, state, and local entities regulate electricity providers.106 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”107 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that (stating that “any electricity that enters the grid immediately becomes a part of a vast pool of energy that is constantly moving in interstate commerce.”) (citation omitted). In Federal Power Comm’n v. Southern California Edison Co., 376 U.S. 205 (1964), the Supreme Court found that a sale for resale of electricity from Southern California Edison to the City of
Colton, which took place solely in California, was under Federal Power Commission jurisdiction because some of the electricity that Southern California Edison marketed came from out of state. The Supreme Court stated that, “`federal jurisdiction was to follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id. at 210 (quoting Connecticut Light & Power Co. v. Federal Power Commission, 324 U.S. 515, 529 (1945) (emphasis omitted)).
Systems, IEEE Press, at 214 (2d ed. 2010).
Systems, IEEE Press, at 213 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 160 of 1596 electricity are privately owned.108 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct 2005, the federal government’s role in electricity regulation greatly increased.109 “The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry.”110 2. Electric system dispatch System operators typically dispatch the electric system through a process known as Security Constrained Economic Dispatch.111 Security Constrained Economic Dispatch has two components – economic generation of generation facilities and ensuring that the electric system remains reliable.112
Systems, IEEE Press, at 213 (2d ed. 2010).
Systems, IEEE Press, at 214 (2d ed. 2010). 111 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic
NERC, at 2 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 118 North American Electric Reliability Corporation, History of
NERC, at 4 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 119 North American Electric Reliability Corporation, History of
NERC, at 3 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 164 of 1596 impacting an area with an estimated 50 million people and 61,800 megawatts of electric load.120 The U.S. and Canada formed a joint task force to investigate the causes of the blackout and made recommendations to avoid similar outages in the future. One of the task force’s major recommendations was that the U.S. Congress should pass legislation making electric reliability standards mandatory and enforceable.121 Congress responded to this recommendation in EPAct 2005, adding a new section 215 to the Federal Power Act making reliability standards mandatory and enforceable and authorizing the creation of a new Electric Reliability Organization (ERO). Under this new system, FERC certifies an entity as the ERO. The
ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so 120 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 1 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. The outage impacted areas within Ohio, Michigan, Pennsylvania, New York, Vermont,
Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 121 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 165 of 1596 independently.122 In 2006, the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.123 “NERC develops and enforces Reliability Standards; monitors the Bulk-Power System; assesses adequacy annually via a 10-year forecast and winter and summer forecasts; audits owners, operators and users for preparedness; and educates and trains industry personnel.”124 The United States, Canada, and part of Mexico are divided up into eight reliability regional entities.125 These regional entities include Florida Reliability Coordinating Council (FRCC), Midwest Reliability Organization (MRO), Northeast Power Coordinating Council (NPCC), Reliability First Corporation (RFC), SERC Reliability Corporation (SERC), Southwest Power
Pool, RE (SPP), Texas Reliability Entity (TRE), and Western Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 118 FERC ¶ 61,218, at P 3 (2007) (citing 16
Sustainable Energy, 2015 Factbook: Sustainable Energy in
RPS or similar laws.147 Use of RE continues to grow rapidly in the U.S. In 2013, electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.148 In 2013, U.S. non-
Systems, IEEE Press, at 220-221 (2d ed. 2010). 145 Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam. Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010). 146 Casazza, J. and Delea, F., Understanding Electric Power
Systems, IEEE Press, at 220-221 (2d ed. 2010). 147 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015). 148 Energy Information Administration, Annual Energy Outlook 2015 with Projections to 2040, at ES-6 (2014) and Energy Information
Administration, Monthly Energy Review, May 2015, Table 7.2b, *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 174 of 1596 hydro RE capacity for the total electric power industry exceeded 80,000 MW, reflecting a fivefold increase in just 15 years.149 In particular, there has been substantial growth in the wind and photovoltaic (PV) markets in the past decade. Since 2009, U.S. wind generation has tripled and solar generation has grown twenty-fold.150 The global market for RE is projected to grow to $460 billion per year by 2030.151 RE growth is further encouraged by the significant amount of existing natural resources that can support RE production in the United States.152 In the Energy Information Administration’s Annual Energy Outlook 2015, RE generation grows substantially from 2013 to 2040 in the available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf. 149 Non-hydro RE capacity for the total electric power industry was more than 16,000 megawatts (MW) in 1998. Energy Information
CAA section 110(a)(2)(D)(i)(I), the “Good Neighbor Provision,” requires state implementation plans (SIPs) to prohibit emissions that “contribute significantly to nonattainment . . . or interfere with maintenance” of the NAAQS in any other state.168 If the EPA finds that a state has failed to submit an approvable SIP, the EPA must issue a federal implementation plan (FIP) to prohibit those emissions “at any time” within the next two years.169 42 U.S.C. § 7651g. Such plans may simply state that the owner or operator expects to hold sufficient allowances or, in the case of alternative compliance methods, must provide a “comprehensive description of the schedule and means by which the unit will rely on one or more alternative methods of compliance in the manner and time authorized under [Title IV].” 42 U.S.C. § 7651g(b). 168 42 U.S.C. § 7410(a)(2)(D)(i)(I). 169 EPA v. EME Homer City Generation, L.P., 134 S. Ct. 1584, 1600–01 (2014) (citing 42 U.S.C. § 7410(c)). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 180 of 1596 In three major rulemakings — the NOx SIP Call,170 the Clean Air Interstate Rule (CAIR),171 and the Cross State Air Pollution Rule (CSAPR)172 — the EPA has attempted to delineate the scope of the Good Neighbor Provision. These rulemakings have several features in common. Although the Good Neighbor Provision does not speak specifically about EGUs, in all three rulemakings, the
EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In 1998, the EPA promulgated the NOx SIP Call, which required 23 upwind states to reduce emissions of NOx that would impact downwind areas with ozone problems. The EPA determined emission reduction requirements based on reductions achievable through “highly cost-effective” controls—i.e., controls that would cost on average no more than $2,000 per ton of emissions reduced.173 The EPA determined that a uniform emission rate on large EGUs coupled with a cap-and-trade program 63 FR 57356 (Oct. 27, 1998). 70 FR 25162 (May 12, 2005). 172 76 FR 48208 (Aug. 8, 2011). 173 63 FR at 57377–78. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 181 of 1596 was one such set of highly cost-effective controls.174
The D.C. Circuit upheld the NOx SIP Call in most significant respects, including its use of costs to apportion emission reduction responsibilities.175 b. Clean Air Interstate Rule (CAIR). In 2005, the EPA promulgated CAIR, which required 28 upwind states to reduce emissions of NOx and SO2 that would impact downwind areas with projected nonattainment and maintenance problems for ozone and PM2.5. The EPA determined emission reduction requirements based on “controls that are known to be highly cost effective for EGUs.”176 The EPA established cap-and-trade programs for sources of NOx and SO2 in states that chose to participate in the trading programs via their SIPs and for states ultimately subject to a
MATS rule are required to comply by April 16, 2012 or upon startup, whichever is later. 70 F.R. 28606, at 28621. That said, states could “require reductions beyond those required by the [s]tate budget.” Id. at 28621. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 186 of 1596 Existing sources subject to the MATS rule were required to
http://journals.ametsoc.org/doi/pdf/10.1175/2008BAMS2370.1.