Part of E.O. 12866 and 13563 Review: Transmittal of revised CPP final rule package for further Interagency Review (2060-AR33) (7/24/2015)
Other documents for the same rulemaking
References: 47 extracted, 0 linked to papers
Systems, IEEE Press, at 2-4 (2d ed. 2010). 64 Casazza, J. and Delea, F., Understanding Electric Power
Systems, IEEE Press, at 5-6 (2d ed. 2010). Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs. If these costs can be spread to more customers, then this can reduce the amount that each individual customer pays. Federal Energy Regulatory Commission, Energy Primer: A Handbook of Energy Market Basics, at 38 (2012), available at http://www.ferc.gov/market-oversight/guide/energy-primer.pdf. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 140 of 1543 systems with federal regulation coming later in response to public concerns about rising electricity costs.65
Initially, states had broad authority to regulate public utilities, but gradually federal regulation increased. In 1920, Congress passed the Federal Water Power Act, creating the Federal Power Commission (FPC) and providing for the licensing of hydroelectric facilities on U.S. government lands and navigable waters of the U.S.66 During this time period, the U.S. Supreme Court found that state authority to regulate public utilities is limited, holding that the Commerce Clause does not allow state regulation to directly burden interstate commerce.67 For example, in Public Utilities Commission of Rhode Island v. Attleboro Steam & Electric Company, Rhode Island sought to regulate the electricity rates that a Rhode Island generator was charging to a company in Massachusetts that resold the electricity to Attleboro, Massachusetts.68 The Supreme Court found that Rhode Island’s regulation was impermissible because
NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”74 In 1977, the FPC became FERC after Congress passed the Department of Energy Organization Act. By the 1930s, regulated electric utilities that provided the major components of the electrical system - generation, transmission, and distribution - were common.75 These regulated monopolies are referred to as vertically-integrated utilities. As utilities built larger and larger electric generation plants, the cost per unit to generate electricity decreased.76
Systems, IEEE Press, at 159 (2d ed. 2010). 101 Casazza, J. and Delea, F., Understanding Electric Power
Colton, which took place solely in California, was under Federal Power Commission jurisdiction because some of the electricity that Southern California Edison marketed came from out of state. The Supreme Court stated that, “`federal jurisdiction was to follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id. at 210 (quoting Connecticut Light & Power Co. v. Federal Power Commission, 324 U.S. 515, 529 (1945) (emphasis omitted)).
Systems, IEEE Press, at 214 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 151 of 1543 network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”104 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that electricity are privately owned.105 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct 2005, the federal government’s role in electricity regulation greatly increased.106 “The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the
Systems, IEEE Press, at 213 (2d ed. 2010).
Systems, IEEE Press, at 214 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 152 of 1543 transmission system and more hands-on oversight and control of the planning and operating rules for the industry.”107 2. Electric system dispatch System operators typically dispatch the electric system through a process known as Security Constrained Economic Dispatch.108 Security Constrained Economic Dispatch has two components – economic generation of generation facilities and ensuring that the electric system remains reliable.109 Electricity demand varies across geography and time in response to numerous conditions, such that electric generators are constantly responding to changes in the most reliable and costeffective manner possible. The cost of operating electric generation varies based on a number of factors, such as fuel and generator efficiency.
Systems, IEEE Press, at 214 (2d ed. 2010). 108 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic
Ontario, Canada experienced the largest power blackout to date, impacting 30 million people.112 In response to the 1965 blackout and a Federal Power Commission recommendation,113 industry developed the National Electric Reliability Council (NERC) and nine reliability councils. The organization later became known as the North American Electric Reliability Council to recognize North American Electric Reliability Corporation, History of
NERC, at 2 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 115 North American Electric Reliability Corporation, History of
NERC, at 4 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 116 North American Electric Reliability Corporation, History of
NERC, at 3 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 117 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 1 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. The outage impacted areas within Ohio, Michigan, Pennsylvania, New York, Vermont,
Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 156 of 1543 Congress should pass legislation making electric reliability standards mandatory and enforceable.118 Congress responded to this recommendation in EPAct 2005, adding a new section 215 to the Federal Power Act making reliability standards mandatory and enforceable and authorizing the creation of a new Electric Reliability Organization (ERO). Under this new system, FERC certifies an entity as the ERO. The
ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so independently.119 In 2006, the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.120 “NERC develops and enforces Reliability Standards; monitors the Bulk-Power System; assesses adequacy annually via a 10-year forecast and U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. 119 Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 118 FERC ¶ 61,218, at P 3 (2007) (citing 16
U.S.C. 824o(e)(3)). 120 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, 114 FERC ¶ 61,104 (2006). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 157 of 1543 winter and summer forecasts; audits owners, operators and users for preparedness; and educates and trains industry personnel.”121 The United States, Canada, and part of Mexico are divided up into eight reliability regional entities.122 These regional entities include Florida Reliability Coordinating Council (FRCC), Midwest Reliability Organization (MRO), Northeast Power Coordinating Council (NPCC), Reliability First Corporation (RFC), SERC Reliability Corporation (SERC), Southwest Power
Sustainable Energy, 2015 Factbook: Sustainable Energy in
Systems, IEEE Press, at 220-221 (2d ed. 2010). 142 Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam. Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010). 143 Casazza, J. and Delea, F., Understanding Electric Power
Systems, IEEE Press, at 220-221 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 165 of 1543 2013, 29 states and the District of Columbia have enforceable
RPS or similar laws.144 Use of RE continues to grow rapidly in the U.S. In 2013, electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.145 In 2013, U.S. nonhydro RE capacity for the total electric power industry exceeded 80,000 MW, reflecting a fivefold increase in just 15 years.146 In particular, there has been substantial growth in the wind and photovoltaic (PV) markets in the past decade. Since 2009, U.S. wind generation has tripled and solar generation has grown twenty-fold.147 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015). 145 Energy Information Administration, Annual Energy Outlook 2015 with Projections to 2040, at ES-6 (2014) and Energy Information
Administration, Monthly Energy Review, May 2015, Table 7.2b, available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf. 146 Non-hydro RE capacity for the total electric power industry was more than 16,000 megawatts (MW) in 1998. Energy Information
The D.C. Circuit upheld the NOx SIP Call in most significant respects, including its use of costs to apportion emission reduction responsibilities.172 b. Clean Air Interstate Rule (CAIR). In 2005, the EPA promulgated CAIR, which required 28 upwind states to reduce emissions of NOx and SO2 that would impact downwind areas with projected nonattainment and maintenance problems for ozone and PM2.5. The EPA determined emission reduction requirements based on “controls that are known to be highly cost effective for EGUs.”173 The EPA established cap-and-trade programs for sources of NOx and SO2 in states that chose to participate in the trading programs via their SIPs and for states ultimately subject to a 63 FR at 57377–78. 63 FR at 57377–78. In addition to EGUs, the NOx SIP Call also set budgets based on highly cost-effective emission reductions from certain other large sources. Id. 172 Michigan v. EPA, 213 F.3d 663 (D.C. Cir. 2000). 173 70 FR at 25163. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 173 of 1543
MATS rule are required to comply by April 16, 2012 or upon startup, whichever is later. 70 F.R. 28606, at 28621. That said, states could “require reductions beyond those required by the [s]tate budget.” Id. at 28621. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 177 of 1543 Existing sources subject to the MATS rule were required to begin meeting the rule’s requirements on April 16, 2015. Controls that will achieve the MATS performance standards are being installed on many units. Certain units, especially those that operate infrequently, may be considered not worth investing in given today’s electricity market, and are closing. The final
Systems, IEEE Press, at 2-4 (2d ed. 2010). 71 Casazza, J. and Delea, F., Understanding Electric Power
Systems, IEEE Press, at 5-6 (2d ed. 2010). Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs. If these costs can be spread to more customers, then this can reduce the amount that each individual customer pays. Federal Energy Regulatory Commission, Energy Primer: A Handbook *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 140 of 1544 governments initially regulated these growing electricity systems with federal regulation coming later in response to public concerns about rising electricity costs.72
NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”81 In 1977, the FPC became FERC after Congress passed the Department of Energy Organization Act. By the 1930s, regulated electric utilities that provided the major components of the electrical system - generation, transmission, and distribution - were common.82 These regulated monopolies are referred to as vertically-integrated utilities. As utilities built larger and larger electric generation plants, the cost per unit to generate electricity decreased.83
Systems, IEEE Press, at 159 (2d ed. 2010). 108 Casazza, J. and Delea, F., Understanding Electric Power
Colton, which took place solely in California, was under Federal Power Commission jurisdiction because some of the electricity that Southern California Edison marketed came from out of state. The Supreme Court stated that, “`federal jurisdiction was to follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id. at 210 (quoting Connecticut Light & Power Co. v. Federal Power Commission, 324 U.S. 515, 529 (1945) (emphasis omitted)). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 151 of 1544
Today, federal, state, and local entities regulate electricity providers.110 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”111 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that electricity are privately owned.112 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct 2005, the federal government’s role in electricity regulation greatly increased.113 “The role of the regulator now includes support for the development of open and
Systems, IEEE Press, at 214 (2d ed. 2010).
Systems, IEEE Press, at 214 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 152 of 1544 fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry.”114 2. Electric system dispatch System operators typically dispatch the electric system through a process known as Security Constrained Economic Dispatch.115 Security Constrained Economic Dispatch has two components – economic generation of generation facilities and ensuring that the electric system remains reliable.116 Electricity demand varies across geography and time in response to numerous conditions, such that electric generators are constantly responding to changes in the most reliable and costeffective manner possible. The cost of operating electric generation varies based on a number of factors, such as fuel and generator efficiency.
Systems, IEEE Press, at 214 (2d ed. 2010). 115 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic
Ontario, Canada experienced the largest power blackout to date, impacting 30 million people.119 In response to the 1965 blackout and a Federal Power Commission recommendation,120 industry developed the National Electric Reliability Council (NERC) and nine reliability councils. The organization later became known as the North American Electric Reliability Council to recognize North American Electric Reliability Corporation, History of
NERC, at 2 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 122 North American Electric Reliability Corporation, History of
NERC, at 4 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 123 North American Electric Reliability Corporation, History of
NERC, at 3 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 124 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 1 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. The outage impacted areas within Ohio, Michigan, Pennsylvania, New York, Vermont,
Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 156 of 1544 Congress should pass legislation making electric reliability standards mandatory and enforceable.125 Congress responded to this recommendation in EPAct 2005, adding a new section 215 to the Federal Power Act making reliability standards mandatory and enforceable and authorizing the creation of a new Electric Reliability Organization (ERO). Under this new system, FERC certifies an entity as the ERO. The
ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so independently.126 In 2006, the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.127 “NERC develops and enforces Reliability Standards; monitors the Bulk-Power System; assesses adequacy annually via a 10-year forecast and 125 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. 126 Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 118 FERC ¶ 61,218, at P 3 (2007) (citing 16
U.S.C. 824o(e)(3)). 127 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, 114 FERC ¶ 61,104 (2006). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 157 of 1544 winter and summer forecasts; audits owners, operators and users for preparedness; and educates and trains industry personnel.”128 The United States, Canada, and part of Mexico are divided up into eight reliability regional entities.129 These regional entities include Florida Reliability Coordinating Council (FRCC), Midwest Reliability Organization (MRO), Northeast Power Coordinating Council (NPCC), Reliability First Corporation (RFC), SERC Reliability Corporation (SERC), Southwest Power
Systems, IEEE Press, at 220-221 (2d ed. 2010). 150 Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam. Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010). 151 Casazza, J. and Delea, F., Understanding Electric Power
Systems, IEEE Press, at 220-221 (2d ed. 2010). *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 165 of 1544 2013, 29 states and the District of Columbia have enforceable
RPS or similar laws.152 Use of RE continues to grow rapidly in the U.S. In 2013, electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity, up from 9 percent in 2005.153 In 2013, U.S. nonhydro RE capacity for the total electric power industry exceeded 80,000 MW, reflecting a fivefold increase in just 15 years.154 In particular, there has been substantial growth in the wind and photovoltaic (PV) markets in the past decade. Since 2009, U.S. wind generation has tripled and solar generation has grown twenty-fold.155 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015). 153 Energy Information Administration, Annual Energy Outlook 2015 with Projections to 2040, at ES-6 (2014) and Energy Information
Administration, Monthly Energy Review, May 2015, Table 7.2b, available at http://www.eia.gov/totalenergy/data/monthly/pdf/sec7_6.pdf. 154 Non-hydro RE capacity for the total electric power industry was more than 16,000 megawatts (MW) in 1998. Energy Information
The D.C. Circuit upheld the NOx SIP Call in most significant respects, including its use of costs to apportion emission reduction responsibilities.180 b. Clean Air Interstate Rule (CAIR). In 2005, the EPA promulgated CAIR, which required 28 upwind states to reduce emissions of NOx and SO2 that would impact downwind areas with projected nonattainment and maintenance problems for ozone and PM2.5. The EPA determined emission reduction requirements based on “controls that are known to be highly cost effective for EGUs.”181 The EPA established cap-and-trade programs for sources of NOx and SO2 in states that chose to participate in the trading programs via their SIPs and for states ultimately subject to a 63 FR at 57377–78. 63 FR at 57377–78. In addition to EGUs, the NOx SIP Call also set budgets based on highly cost-effective emission reductions from certain other large sources. Id. 180 Michigan v. EPA, 213 F.3d 663 (D.C. Cir. 2000). 181 70 FR at 25163. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 173 of 1544
MATS rule are required to comply by April 16, 2012 or upon startup, whichever is later. 70 F.R. 28606, at 28621. That said, states could “require reductions beyond those required by the [s]tate budget.” Id. at 28621. *** E.O. 12866 Review – Draft – Do Not Cite, Quote or Release During Review *** Page 177 of 1544 Existing sources subject to the MATS rule were required to begin meeting the rule’s requirements on April 16, 2015. Controls that will achieve the MATS performance standards are being installed on many units. Certain units, especially those that operate infrequently, may be considered not worth investing in given today’s electricity market, and are closing. The final
http://journals.ametsoc.org/doi/pdf/10.1175/2008BAMS2370.1.