Policy Replication

Documentation of Changes Made During OMB Review Under E.O. 12866 and 13563 through August 1, 2015 - CPP Final FRN

Docket document2015-10-23 · EPA · review_record · EPA-HQ-OAR-2013-0602-36874
RIN 2060-AR33, RIN 2060-AR88 · Docket EPA-HQ-OAR-2013-0602

Other documents for the same rulemaking

2014-06-18 Federal RegisterCarbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units
2014-06-18 Regulatory impact analysisRIA for the Final Revisions to the National Ambient Air Quality Standards for Particulate Matter; 2012 [EPA-452/R-12-005]
2014-06-18 Regulatory impact analysisRegulatory Impact Analysis for the Proposed Carbon Pollution Guidelines for Existing Power Plants and Emission Standards for Modified and Reconstructed Power Plants - June 2014 [EPA -542/R-14-002]
2014-06-18 Regulatory impact analysis2008 Ozone NAAQS RIA Benefits Chapter
2014-06-18 Regulatory impact analysisEmail to OMB - Revisions to Chapter 9 of RIA (May 23, 2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding organization of meetings on the EGU GHG Existing Source NPRM for a legal discussion and RIA briefing (2060-AR33) (4/10/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding a meeting on the EGU GHG Existing Source NPRM RIA results compared to EIA and RFF projections (2060-AR33) (4/24/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (single document) (2060-AR33) (5/28/2014)
2014-06-18 Regulatory impact analysisSummary of the Updated Regulatory Impact Analysis (RIA) for the Reconsideration of the 2008 Ozone National Ambient Air Quality Standard (NAAQS); Section 3: Re-analysis of the Benefits of Attaining Alternative Ozone Standards to Incorporate Current Methods
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA chapters (2060-AR33) (5/15/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding a meeting on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/21/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding Interagency request for EGU GHG Existing Source NPRM RIA IPM Output (2060-AR33) (4/17/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA, Chapter 4 (2060-AR33) (5/26/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request to combine the EGU GHG Existing Source NPRM RIA chapters into one single document (2060-AR33) (5/16/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA and Alternative Renewable Energy (RE) Approach TSD (2060-AR33) (5/30/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA, Chapter 8 (2060-AR33) (5/30/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/24/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding the EGU GHG Existing Source NPRM RIA (2060-AR33) (4/21/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM Preamble and RIA (2060-AR33) (5/2/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (Clean) (2060-AR33) (5/30/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding EGU GHG Existing Source NPRM Building Blocks 1 and 2 Memo and RIA (2060-AR33) (5/21/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/30/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding a meeting on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/22/2014)
2014-06-18 Regulatory impact analysisRegulatory Impact Analysis for the Proposed Carbon Pollution Guidelines for Existing Power Plants and Emission Standards for Modified and Reconstructed Power Plants [EPA -542/R-14-002]
2014-06-18 Regulatory impact analysisFinal Ozone NAAQS Regulatory Impact Analysis; Chapter 6: Incremental Benefits of Attaining Alternative Ozone Standards Relative to the Current 8-hour Standard (0.08 ppm)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (Redline and Clean) (2060-AR33) (5/30/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for EGU GHG Existing Source NPRM RIA briefing and the 111(b) regulatory text TSD (2060-AR33) (4/18/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/28/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA, Executive Summary and Chapters 3 and 6 (2060-AR33) (5/29/2014)
2014-06-18 Regulatory impact analysisRegulatory Impact Analysis for the Final Revisions to the National Ambient Air Quality Standards for Particulate Matter [EPA-452/R-12-005]
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/25/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA, Chapter 4 (2060-AR33) (5/28/2014)
2014-06-18 Regulatory impact analysisPart of E.O. 12866 and 13563 Review: Interagency Comments on the EGU GHG Existing Source NPRM RIA (2060-AR33) (5/14/2014)
2014-06-18 Regulatory impact analysisMemo: Emission Reductions, Costs, Benefits and Economic Impacts Associated with Buliding Blocks 1 and 2.
2014-06-18 Regulatory impact analysisCalifornia Standard Practice Manual: Economic Analysis of Demand-Side Programs and Projects
2014-06-18 Regulatory impact analysisBenefit-Cost Analysis in Environmental, Health, and Safety Regulation: A Statement of Principles
2014-06-18 Regulatory impact analysisLBNL Energy and Economic Impacts of U.S. Federal Energy and Water Conservation Standards Adopted From 1987 Through 2012
2014-06-18 Regulatory impact analysisMemorandum: Emission Reductions, Costs, Benefits and Economic Impacts Associated with Building Blocks 1 & 2
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Large Public Power Council (2060-AR33) (4/17/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of white paper from Pennsylvania Department of Environmental Protection under EO 12866 (2060-AR33) (4/10/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the National Rural Electric Cooperative Association (2060-AR33) (4/17/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the National Climate Coalition (2060-AR33) (4/29/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Canadian Electricity Association (2060-AR33) (5/2/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with RePower South (2060-AR33) (4/29/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Natural Resources Defense Council (2060-AR33) (5/2/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Association of Home Appliance Manufacturers (2060-AR33) (5/2/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with Sierra Club (2060-AR33) (5/2/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with Alevo (2060-AR33) (5/8/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of white paper from Coalition for Innovative Climate Solutions under EO 12866 (2060-AR33) (4/9/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with the Coalition for Innovative Climate Solutions (2060-AR33) (4/11/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Meeting materials from E.O. 12866 meeting with Waste Management (2060-AR33) (5/2/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for multiple TSDs on the EGU GHG Existing Source NPRM (2060-AR33) (5/29/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for Alternative Renewable Energy (RE) Approach TSD on the EGU GHG Existing Source NPRM (2060-AR33) (5/29/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding Interagency Comments on the EGU GHG Existing Source NPRM GHG Abatement TSD, Chapter 5 (2060-AR33) (5/30/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding scheduling a meeting to discuss Interagency Comments on the EGU GHG Existing Source NPRM (2060-AR33) (5/30/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding organization of a meeting on the EGU GHG Existing Source NPRM with DOJ (2060-AR33) (4/17/2014)
2014-06-18 Docket documentDocument submitted to initiate E.O. 12866 and 13563 review - EGU GHG Existing Source NPRM
2014-06-18 Docket documentDocumentation of Changes Made During OMB Review Under E.O. 12866 and 13563 through May 28, 2014 - EGU GHG Existing Source NPRM
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for EGU GHG Existing Source NPRM Survey of Existing State Policies and Programs (2060-AR33) (4/4/2014)
2014-06-18 Docket documentPart of E.O. 12866 and 13563 Review: Interagency Discussion regarding status of briefing materials for the overview briefing on the EGU GHG Existing Source NPRM (2060-AR33) (4/7/2014)

References: 27 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
Systems, IEEE Press, at 2-4 (2d ed. 2010). 77 Casazza, J. and Delea, F., Understanding Electric Power
research reportNot linked to a paper · refsec
Systems, IEEE Press, at 5-6 (2d ed. 2010). Investment in electric generation is extremely capital intensive, with generation potentially accounting for 65 percent of customer costs. If these costs can be spread to more customers, then this can reduce the amount that each individual customer pays. Federal Energy Regulatory Commission, Energy Primer: A Handbook of Energy Market Basics, at 38 (2012), available at http://www.ferc.gov/market-oversight/guide/energy-primer.pdf. *** E.O. 12866 Review – DraftRevised Version – Do Not Cite, Quote or Release During Review Page 197 of 2153 systems with federal regulation coming later in response to public concerns about rising electricity costs.78
journal articleNot linked to a paper · refsec · cited link
NGA also gave the FPC the jurisdiction to “grant certificates allowing construction and operation of facilities used in interstate gas transmission and authorizing the provision of services.”87 In 1977, the FPC became FERC after Congress passed the Department of Energy Organization Act. By the 1930s, regulated electric utilities that provided the major components of the electrical system - generation, transmission, and distribution - were common.88 These regulated monopolies are referred to as vertically-integrated utilities. As utilities built larger and larger electric generation plants, the cost per unit to generate electricity decreased.89
research reportNot linked to a paper · refsec
Systems, IEEE Press, at 159 (2d ed. 2010). Casazza, J. and
research reportNot linked to a paper · refsec
Systems, IEEE Press, at 159 (2d ed. 2010). 114 Casazza, J. and Delea, F., Understanding Electric Power
research reportNot linked to a paper · refsec
Today, federal, state, and local entities regulate electricity providers.116 Overlaid on the physical electricity network is a regulatory network that has developed over the last century or more. This regulatory network “plays a vital role in the functioning of all other networks, sometimes providing specific rules for functioning while at other times providing restraints within which their operation must be conducted.”117 This unique regulatory network results in an electricity grid that is both physically interconnected and connected through a network of regulation on the local, state, and federal levels. This regulation seeks to reconcile the fact that electricity is a public good with the fact that facilities providing that omitted). See also New York v. FERC, 535 U.S. 1, at 7 (2002) (stating that “any electricity that enters the grid immediately becomes a part of a vast pool of energy that is constantly moving in interstate commerce.”) (citation omitted). In Federal Power Comm’n v. Southern California Edison Co., 376 U.S. 205 (1964), the Supreme Court found that a sale for resale of electricity from Southern California Edison to the City of
research reportNot linked to a paper · refsec
Colton, which took place solely in California, was under Federal Power Commission jurisdiction because some of the electricity that Southern California Edison marketed came from out of state. The Supreme Court stated that, “`federal jurisdiction was to follow the flow of electric energy, an engineering and scientific, rather than a legalistic or governmental, test.’” Id. at 210 (quoting Connecticut Light & Power Co. v. Federal Power Commission, 324 U.S. 515, 529 (1945) (emphasis omitted)).
research reportNot linked to a paper · refsec
Systems, IEEE Press, at 214 (2d ed. 2010).
research reportNot linked to a paper · refsec
Systems, IEEE Press, at 213 (2d ed. 2010). *** E.O. 12866 Review – DraftRevised Version – Do Not Cite, Quote or Release During Review Page 209 of 2153 electricity are privately owned.118 While this regulation began on the state and local levels, federal regulation of the electricity system increased over time. With the passage of the EPAct 1992 and the EPAct 2005, the federal government’s role in electricity regulation greatly increased.119 “The role of the regulator now includes support for the development of open and fair wholesale electric markets, ensuring equal access to the transmission system and more hands-on oversight and control of the planning and operating rules for the industry.”120 2. Electric system dispatch System operators typically dispatch the electric system through a process known as economic dispatch.Security Constrained Economic dispatchDispatch.121 Security Constrained Economic Dispatch has been defined as “the operation two components – economic generation of generation facilities to produce energy at the lowest cost to reliably serve consumers, recognizing any operational limits of generation and
journal articleNot linked to a paper · refsec
Systems, IEEE Press, at 213 (2d ed. 2010).
research reportNot linked to a paper · refsec
Systems, IEEE Press, at 214 (2d ed. 2010). 121 Economic Dispatch: Concepts, Practices and Issues, FERC Staff Presentation to the Joint Board for the Study of Economic
research reportNot linked to a paper · refsec
Ontario, Canada experienced the largest power blackout to date, impacting 30 million people.125 In response to the 1965 blackout and a Federal Power Commission recommendation,126 industry developed the National Electric Reliability Council (NERC) and nine reliability councils. The organization later became known as the North American Electric Reliability Council to recognize Canada’s participation.127 The North American Electric Reliability Council became the North American Electric Reliability Corporation in 2007.128 North American Electric Reliability Corporation, History of
research reportNot linked to a paper · refsec
NERC, at 1 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 125 Federal Energy Regulatory Commission, Energy Primer: A Handbook of Energy Market Basics, at 39 (2012), available at http://www.ferc.gov/market-oversight/guide/energy-primer.pdf. 126 The Federal Power Commission, a precursor to FERC, recommended “the formation of a council on power coordination made up of representatives from each of the nation’s regional coordinating organizations, to exchange and disseminate information and to review, discuss and assist in resolving interregional coordination matters.” North American Electric Reliability Corporation, History of NERC, at 1 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 127 North American Electric Reliability Corporation, History of
journal articleNot linked to a paper · refsec · cited link
NERC, at 2 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf . The North American Electric Reliability Council became the North American Electric Reliability Corporation in 2007. Id. at 4. . 128 North American Electric Reliability Corporation, History of
research reportNot linked to a paper · refsec · cited link
NERC, at 4 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. *** E.O. 12866 Review – DraftRevised Version – Do Not Cite, Quote or Release During Review Page 213 of 2153 In August 2003, North America experienced its worst blackout to date creating an outage in the Midwest, Northeast, and Ontario, Canada.129 This blackout was massive in scale impacting an area with an estimated 50 million people and 61,800 megawatts of electric load.130 The U.S. and Canada formed a joint task force to investigate the causes of the blackout and made recommendations to avoid similar outages in the future. One of the task force’s major recommendations was that the U.S. Congress should pass legislation making electric reliability standards mandatory and enforceable.131 Congress responded to this recommendation in EPAct 2005, adding a new section 215 to the Federal Power Act making reliability standards mandatory and enforceable and authorizing North American Electric Reliability Corporation, History of
journal articleNot linked to a paper · refsec · cited link
NERC, at 3 (2013), available at http://www.nerc.com/AboutNERC/Documents/History%20AUG13.pdf. 130 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 1 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. The outage impacted areas within Ohio, Michigan, Pennsylvania, New York, Vermont,
research reportNot linked to a paper · refsec · cited link
Massachusetts, Connecticut, New Jersey, and the Canadian province of Ontario. Id. 131 U.S.-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, at 2 (Apr. 2004), available at http://www.ferc.gov/industries/electric/indusact/reliability/blackout/ch1-3.pdf. *** E.O. 12866 Review – DraftRevised Version – Do Not Cite, Quote or Release During Review Page 214 of 2153 the creation of a new Electric Reliability Organization (ERO). Under this new system, FERC certifies an entity as the ERO. The
journal articleNot linked to a paper · refsec · cited link
ERO develops reliability standards, which are subject to FERC review and approval. Once FERC approves reliability standards the ERO may enforce those standards or FERC can do so independently.132 In 2006, the Federal Energy Regulatory Commission (FERC) certified NERC as the ERO.133 “NERC develops and enforces Reliability Standards; monitors the Bulk-Power System; assesses adequacy annually via a 10-year forecast and winter and summer forecasts; audits owners, operators and users for preparedness; and educates and trains industry personnel.”134 The United States, Canada, and part of Mexico are divided up into eight reliability regional entities.135 These regional entities include Florida Reliability Coordinating Council (FRCC), Midwest Reliability Organization (MRO), Northeast Power Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 118 FERC ¶ 61,218, at P 3 (2007) (citing 16
research reportNot linked to a paper · refsec
U.S.C. 824o(e)(3)). 133 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, 114 FERC ¶ 61,104 (2006). 134 North American Electric Reliability Corporation, Frequently Asked Questions, at 2 (Aug. 2013), available at http://www.nerc.com/AboutNERC/Documents/NERC%20FAQs%20AUG13.pdf. 135 Federal Energy Regulatory Commission, Energy Primer: A Handbook of Energy Market Basics, at 49-50 (2012), available at http://www.ferc.gov/market-oversight/guide/energy-primer.pdf. *** E.O. 12866 Review – DraftRevised Version – Do Not Cite, Quote or Release During Review Page 215 of 2153 Coordinating Council (NPCC), Reliability First Corporation (RFC), SERC Reliability Corporation (SERC), Southwest Power
journal articleNot linked to a paper · refsec · cited link
Sustainable Energy, 2015 Factbook: Sustainable Energy in
research reportNot linked to a paper · refsec
Systems, IEEE Press, at 220-221 (2d ed. 2010). 156 Cogeneration facilities utilize a single source of fuel to produce both electricity and another form of energy such as heat or steam. Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010). 157 Casazza, J. and Delea, F., Understanding Electric Power
research reportNot linked to a paper · refsec
Systems, IEEE Press, at 220-221 (2d ed. 2010). 158 U.S. Energy Information Administration (EIA), Annual Energy Outlook 2014 with Projections to 2040, at LR-5 (2014), available at http://www.eia.gov/forecasts/aeo/pdf/0383(2014).pdf (last visited May 26, 2015). *** E.O. 12866 Review – DraftRevised Version – Do Not Cite, Quote or Release During Review Page 223 of 2153 Use of RE continues to grow rapidly in the U.S. In 2013, electricity generated from renewable technologies, including conventional hydropower, represented 13 percent of total U.S. electricity.159 Total, up from 9 percent in 2005.160 In 2013, U.S. non-hydro RE capacity was approximately 13,000 megawatts (MW) in 1998. In 2013, for the total capacity was over five times higher withelectric power industry exceeded 80,000 MW of non-hydro RE capacity, reflecting a fivefold increase in just 15 years.161 In particular, there has been substantial growth in the wind and photovoltaic (PV) markets in the past decade. Since 2009, U.S. Energy Information Administration, Annual Energy Outlook 2015 with Projections to 2040, at ES-6 (2014). 160 Energy Information Administration, Annual Energy Outlook 2015 with Projections to 2040, at ES-6 (2014) and Energy Information
journal articleNot linked to a paper · refsec · cited link
EPA set state emission “budgets” for upwind states based in part on emissions reductions achievable by EGUs through application description of the schedule and means by which the unit will rely on one or more alternative methods of compliance in the manner and time authorized under [Title IV].” 42 U.S.C. § 7651g(b). 180 42 U.S.C. § 7410(a)(2)(D)(i)(I). 181 EPA v. EME Homer City Generation, L.P., 134 S. Ct. 1584, 1600–01 (2014) (citing 42 U.S.C. § 7410(c)). 182 63 FR 57356 (Oct. 27, 1998). 183 70 FR 25162 (May 12, 2005). 184 76 FR 48208 (Aug. 8, 2011). *** E.O. 12866 Review – DraftRevised Version – Do Not Cite, Quote or Release During Review Page 230 of 2153 of cost-effective controls. Each rule also adopted a phased approach to reducing emissions with both interim and final goals. a. NOx SIP Call. In 1998, the EPA promulgated the NOx SIP Call, which required 23 upwind states to reduce emissions of NOx that would impact downwind areas with ozone problems. The EPA determined emission reduction requirements based on reductions achievable through “highly cost-effective” controls—i.e., controls that would cost on average no more than $2,000 per ton of emissions reduced.185 The EPA determined that a uniform emission rate on large EGUs coupled with a cap-and-trade program was one such set of highly cost-effective controls.186
journal articleNot linked to a paper · refsec
The D.C. Circuit upheld the NOx SIP Call in most significant respects, including its use of costs to apportion emission reduction responsibilities.187 63 FR at 57377–78. 63 FR at 57377–78. In addition to EGUs, the NOx SIP Call also set budgets based on highly cost-effective emission reductions from certain other large sources. Id. 187 Michigan v. EPA, 213 F.3d 663 (D.C. Cir. 2000). *** E.O. 12866 Review – DraftRevised Version – Do Not Cite, Quote or Release During Review Page 231 of 2153 b. Clean Air Interstate Rule (CAIR). In 2005, the EPA promulgated CAIR, which required 28 upwind states to reduce emissions of NOx and SO2 that would impact downwind areas with projected nonattainment and maintenance problems for ozone and PM2.5. The EPA determined emission reduction requirements based on “controls that are known to be highly cost effective for EGUs.”188 The EPA established cap-and-trade programs for sources of NOx and SO2 in states that chose to participate in the trading programs via their SIPs and for states ultimately subject to a
journal articleNot linked to a paper · refsec
MATS rule are required to comply by April 16, 2012 or upon startup, whichever is later. Existing sources subject to the MATS rule were required to begin meeting the rule’s requirements on April 16, 2015. Controls that will achieve the MATS performance standards are being installed on many units. Certain units, especially those that operate infrequently, may be considered not worth investing in given today’s electricity market, and are closing. The final
research reportNot linked to a paper · refsec
http://journals.ametsoc.org/doi/pdf/10.1175/2008BAMS2370.1.
journal articleNot linked to a paper · doi · cited link
http://www.oxfordreference.com.mutex.gmu.edu/view/10.1093/acref/
journal articleNot linked to a paper · doi · cited link