Email from Nick Hutson, USEPA, to Nathan Frey, OMB, 07-31-2015
Original sourcePDF at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at source
Other documents for the same rulemaking
References
DR: additional 25 MW by 2017. Reference Case— Total Cumulative EE by 2032 is 361 MWa at the meter. All Deployable EE case—479 MWa by 2032. 2015 EE: additional 60 MW 2015 DR: 90 MW 2024 EE: additional 567 MW 2024 DR: 95 MW Boardman Plant ends the use of coal by 2020. 2013: $9.10 per short ton 2020: $14.55 per short ton Model a CO2 tax of $16/short ton in 2023,
MW by 2032 Do not serve any retail customers directly. Customers served by the Association’s members. No coal planned. Exposure to fuel price volatility was factored into generation mix choices but no quantitative measurements given.
EE: reduce peak demand by 59 MW by 2028 Total: 119 MW utility-scale nameplate capacity by 2028 (Solar and wind) Solar: 56 MW distributed generation by 2028 Other CC: 138 MW in 2015 CT: 111 MW by 2019 408 MW nameplate capacity in NG resources by 2028 Transmission upgrades and improved storage technologies: 1.85
MW battery storage by 2028 No additional coal planned.
RES requires 4.5% of 2014 load requirement and 15% of 2025 load requirement is met with renewable resources. $17.23/metric ton beginning in 2023. Increasing 6% annually. WoodMackenzie forecast. Arizona Electric Power Cooperative Coop Total annual peak demand forecast of 62.5 MW through 2028 for Duncan Valley Electric
Cooperative, Inc. (GCEC) DR: reduce peak demand by 14 MW by 2028 No demand growth expected 20142021. No indication of new resource capacity in planning horizon. $4.47/MM