Document submitted to conclude E.O. 12866 Review Begin Actual Construction NPRM
Other documents for the same rulemaking (all, by stage)
References
U.S. Environmental Protection Agency. (1978). Memorandum by Edward Reich, Director, Division of Stationary Source Enforcement. Source Construction Prior to Issuance of PSD Permit, available at: https://www.epa.gov/sites/default/files/2015-07/documents/source.pdf.
U.S. Environmental Protection Agency. (1978). Memorandum from Edward Reich, Director, Division of Stationary Source Enforcement. Interpretation of “Constructed” as it Applies to Activities Undertaken Prior to Issuance of a PSD Permit, available at: https://www.epa.gov/sites/default/files/201507/documents/cnstrctd.pdf.
U.S. Environmental Protection Agency. (1981). Letter from Valdas Adamkus, EPA Region 5 Acting Administrator, to Joseph Polito, Esq., “City of Detroit/General Motors Corporation; Central Industrial Park Project,” available at: https://www.epa.gov/sites/default/files/2015-07/documents/indspark.pdf.
U.S. Environmental Protection Agency. (1986). Memorandum from Edward Reich, Director, Stationary Source Compliance Division, Office of Air Quality Planning and Standards (OAQPS). Construction Activities Prior to Issuance of a PSD Permit with Respect to “Begin Actual Construction,” available at: https://www.epa.gov/sites/default/files/2015-07/documents/begin.pdf.
U.S. Environmental Protection Agency. (1993). Memorandum from John Rasnic, Director, Stationary Source Compliance, OAQPS. Construction Activities at Georgia Pacific, available at: https://www.epa.gov/sites/default/files/2015-07/documents/cnstrctn.pdf.
U.S. Environmental Protection Agency. (1995). Letter from John Seitz, Director, EPA OAQPS, to Mr. Charles Williams, Commissioner, Minnesota Pollution Control Agency, available at https://www.epa.gov/sites/default/files/2015-07/documents/19951213.pdf.
U.S. Environmental Protection Agency. (2020). Draft Memorandum from Anne Idsal, Principal Deputy Assistant Administrator for the Office of Air and Radiation. Interpretation of “Begin Actual Construction” Under the New Source Review Preconstruction Permitting Regulations, available at: https://19january2021snapshot.epa.gov/sites/static/files/202003/documents/begin_actual_construction_032520_1.pdf.
U.S. Environmental Protection Agency. (2025). Letter from Aaron Szabo, EPA Assistant Administrator for the Office of Air and Radiation, to Philip McNeely, Director, MCAQD, available at: https://www.epa.gov/system/files/documents/2025-09/tsmc-arizona-begin-actual-construction-eparesponse-letter.pdf.