{"document":{"doc_id":1251,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder  RIA accident data","date":"2022-09-16","url":"https://www.regulations.gov/document/PHMSA-2013-0255-0128","source_native_id":"PHMSA-2013-0255-0128","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2013-0255"],"rins":["RIN 2137-AF06"],"related":[{"doc_id":1390,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment","date":"2020-02-06"},{"doc_id":7232,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards","date":"2020-02-06"},{"doc_id":128898,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Rupture Detection Valve NPRM OMB Redline","date":"2020-12-23"},{"doc_id":1258,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Regulatory Impact Analysis for the \"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","date":"2022-04-08"},{"doc_id":4963,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards","date":"2022-04-08"},{"doc_id":128546,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Redline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866","date":"2022-04-08"},{"doc_id":1253,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder RIA incident data","date":"2022-09-16"},{"doc_id":1255,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"ld cafe co2 nhtsa 2127 al76 epa pria 181016","date":"2022-09-16"},{"doc_id":4448,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Technical Corrections","date":"2023-08-01"},{"doc_id":407,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Additional Technical Corrections","date":"2024-06-28"}],"references":[{"citation_id":179404,"raw_reference":"PHMSA accident data 2002-2020 (see Tables 4-6 and 4-7 of RIA)","cited_authors":"PHMSA","cited_year":"2002-2020","cited_title":"PHMSA accident data 2002-2020","cited_venue":"Pipeline and Hazardous Materials Safety Administration (PHMSA)","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/data-and-statistics/pipeline/distribution-transmission-gathering-lng-and-liquid-accident-and-incident-data","ref_kind":"dataset","section":"Placeholder page (PHMSA accident data 2002-2020 heading)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}