{"document":{"doc_id":12308,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Preliminary Regulatory Impact Analysis (PRIA)","date":"2026-07-08","url":"https://www.regulations.gov/document/PHMSA-2025-0019-0036","source_native_id":"PHMSA-2025-0019-0036","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2025-0019"],"rins":["RIN 2137-AF44"],"related":[{"doc_id":3912,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Repair Criteria for Hazardous Liquid and Gas Transmission Pipelines","date":"2025-05-21"},{"doc_id":127312,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"EO 12866 Meeting-API and LEPA, June 10, 2026","date":"2026-06-12"},{"doc_id":3317,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Repair Criteria for Hazardous Liquid and Gas Transmission Pipelines","date":"2026-07-08"},{"doc_id":127299,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Changes to NPRM during OIRA Review","date":"2026-07-14"},{"doc_id":12312,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Additional PRIA References","date":"2026-08-07"}],"references":[{"citation_id":247359,"raw_reference":"Rosen, RoCD EMAT-C Service: In-line High-Resolution Detection and Sizing of Axial Cracks, (2024)","cited_authors":"Rosen","cited_year":"2024","cited_title":"RoCD EMAT-C Service: In-line High-Resolution Detection and Sizing of Axial Cracks","cited_venue":"Rosen Group","cited_doi":null,"cited_url":"https://contenthub.rosen-group.com/api/public/content/7e9f40578f924917a4403fa7fc5ba41e?v=0071d845","ref_kind":"other","section":"fn 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247360,"raw_reference":"Sanjay Tiku et al., PR214-213800-W01, Evaluation of API RP 1183 Dent Fatigue Analyses using In-Service Dents Data (PRCI Dec. 3, 2024)","cited_authors":"Sanjay Tiku et al.","cited_year":"2024","cited_title":"Evaluation of API RP 1183 Dent Fatigue Analyses using In-Service Dents Data","cited_venue":"Pipeline Research Council International (PRCI)","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.2.6.2, fn 46","page":null,"context_sentence":null,"paper_id":59595,"paper_title":"PR214-213800-R01 Evaluation of API RP 1183 Dent Fatigue Analyses using In-Service Dents Data","paper_year":2024,"paper_doi":"10.55274/r0000092"},{"citation_id":247361,"raw_reference":"API, RP 1176, Recommended Practice for Assessment and management of cracking in Pipelines (1st ed. (Errata 1 (2021) and Errata 2 (2022)).","cited_authors":"American Petroleum Institute","cited_year":"2021","cited_title":"Recommended Practice for Assessment and management of cracking in Pipelines","cited_venue":"API","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 3.1.3, fn 24","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247362,"raw_reference":"NTSB, PAR-11/01, Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire, San Bruno, California, Sept. 9, 2010 (2011)","cited_authors":"National Transportation Safety Board","cited_year":"2011","cited_title":"Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire, San Bruno, California, Sept. 9, 2010","cited_venue":"NTSB","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1101.pdf","ref_kind":"research_report","section":"Section 4.1.1.1, fn 53","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247363,"raw_reference":"NTSB, PIR-22/02, Enbridge Inc. Natural Gas Transmission Pipeline Rupture and Fire, Danville, Kentucky, Aug. 1, 2019 (2022)","cited_authors":"National Transportation Safety Board","cited_year":"2022","cited_title":"Enbridge Inc. Natural Gas Transmission Pipeline Rupture and Fire, Danville, Kentucky, Aug. 1, 2019","cited_venue":"NTSB","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PIR22002.pdf","ref_kind":"research_report","section":"Section 4.1.1.1, fn 54","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247364,"raw_reference":"PHMSA, Valuation of Crude Oil Spills in Transportation Incidents (April 2023)","cited_authors":"PHMSA","cited_year":"2023","cited_title":"Valuation of Crude Oil Spills in Transportation Incidents","cited_venue":"U.S. Department of Transportation","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2023-10/PHMSA-OilSpillCosts-Report-Final.pdf","ref_kind":"government_report","section":"Section 4.1.2.1, fn 58","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247365,"raw_reference":"Kenneth Y. Lee et al., Anhydrous Ammonia Pipeline Safety Experience in the United States, Volume 5 (15th Int'l Pipeline Conf. Calgary, Canada Sept. 23–27, 2024)","cited_authors":"Kenneth Y. Lee et al.","cited_year":"2024","cited_title":"Anhydrous Ammonia Pipeline Safety Experience in the United States, Volume 5: Risk and Reliability; Offshore, Upstream, and Production Pipelines; Emerging Fuels and Greenhouse Gas Emissions","cited_venue":"International Pipeline Conference","cited_doi":"10.1115/ipc2024-134176","cited_url":"https://doi.org/10.1115/IPC2024-134176","ref_kind":"conference_paper","section":"Section 4.1.2.1, fn 59","page":null,"context_sentence":null,"paper_id":27700,"paper_title":"Anhydrous Ammonia Pipeline Safety Experience in the United States","paper_year":2024,"paper_doi":"10.1115/ipc2024-134176"},{"citation_id":247366,"raw_reference":"CDC, Occupational Fatalities During Trenching and Excavation Work—United States, 1992–2001, Morbidity & Mortality Weekly Report Vol. 53, Iss. 15, 311–14 (Apr. 23, 2004)","cited_authors":"Centers for Disease Control and Prevention","cited_year":"2004","cited_title":"Occupational Fatalities During Trenching and Excavation Work—United States, 1992–2001","cited_venue":"Morbidity & Mortality Weekly Report","cited_doi":null,"cited_url":"https://www.cdc.gov/mmwr/preview/mmwrhtml/mm5315a2.htm","ref_kind":"research_report","section":"Section 4.2.1, fn 61","page":null,"context_sentence":null,"paper_id":59527,"paper_title":"Occupational fatalities during trenching and excavation work--United States, 1992-2001.","paper_year":2004,"paper_doi":null},{"citation_id":247367,"raw_reference":"Thomas Yohannes et al., Trenching Injuries, Citations and Penalties in Construction, The Ctr. for Construction Research & Training (May 2024)","cited_authors":"Thomas Yohannes et al.","cited_year":"2024","cited_title":"Trenching Injuries, Citations and Penalties in Construction","cited_venue":"The Center for Construction Research and Training","cited_doi":null,"cited_url":"https://www.cpwr.com/wp-content/uploads/DataBulletinMay2024.pdf","ref_kind":"research_report","section":"Section 4.2.1, fn 63","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247368,"raw_reference":"FHWA, Work Zone User Costs—Concepts and Applications (Dec. 2011)","cited_authors":"Federal Highway Administration","cited_year":"2011","cited_title":"Work Zone User Costs—Concepts and Applications","cited_venue":"FHWA","cited_doi":null,"cited_url":"https://ops.fhwa.dot.gov/wz/resources/publications/fhwahop12005","ref_kind":"government_report","section":"Section 4.2.2, fn 65","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247369,"raw_reference":"PHMSA, Cost of Delay from Hazmat Rail Incidents (Dec. 5, 2023)","cited_authors":"PHMSA","cited_year":"2023","cited_title":"Cost of Delay from Hazmat Rail Incidents","cited_venue":"U.S. Department of Transportation","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/planning-and-analytics/economic-research-and-regulatory-analysis-division/cost-delay-hazmat-rail-incidents","ref_kind":"government_report","section":"Section 4.2.2, fn 65","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247370,"raw_reference":"David Schrank et al., 2025 Urban Mobility Report, Texas A&M Transp. Inst. (Aug. 2025)","cited_authors":"David Schrank et al.","cited_year":"2025","cited_title":"2025 Urban Mobility Report","cited_venue":"Texas A&M Transportation Institute","cited_doi":null,"cited_url":"https://static.tti.tamu.edu/tti.tamu.edu/documents/mobility-report-2025.pdf","ref_kind":"research_report","section":"Section 4.2.2, fn 65","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250171,"raw_reference":"CER, SA 2025-01, Evaluation of Dents in Pipe (June 19, 2025)","cited_authors":"CER","cited_year":"2025","cited_title":"Evaluation of Dents in Pipe","cited_venue":"CER","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 75","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250172,"raw_reference":"U.S. Census Bureau, 2023 American Community Survey: 5-Year Estimates, Table B01003 (2023)","cited_authors":"U.S. Census Bureau","cited_year":"2023","cited_title":"2023 American Community Survey: 5-Year Estimates, Table B01003","cited_venue":"U.S. Census Bureau","cited_doi":null,"cited_url":"https://data.census.gov/table/ACSDT5Y2023.B01003?q=ACSDT5Y2023.B01003&g=010XX00US$1600000&y=2023&d=ACS%205-Year%20Estimates%20Detailed%20Tables","ref_kind":"dataset","section":"fn 78","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250173,"raw_reference":"SBA, Table of Small Business Size Standards Matched to North American Industry Classification System Codes (Mar. 17, 2023)","cited_authors":"U.S. Small Business Administration","cited_year":"2023","cited_title":"Table of Small Business Size Standards Matched to North American Industry Classification System Codes","cited_venue":"U.S. Small Business Administration","cited_doi":null,"cited_url":"https://www.sba.gov/document/support-table-size-standards","ref_kind":"dataset","section":"Section 7.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}