{"document":{"doc_id":1225,"source":"cbo_report","org":"CBO","doc_type":"Report","title":"Testimony on the Navy’s 2025 Shipbuilding Plan and Its Implications for the Shipbuilding Industrial Base","date":"2025-03-11","url":"https://www.cbo.gov/publication/61218","source_native_id":"61218","status":"fetched","abstract":null,"action":null},"dockets":[],"rins":[],"related":[],"references":[{"citation_id":83479,"raw_reference":"Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), www.cbo.gov/publication/60732","cited_authors":"Congressional Budget Office","cited_year":"2025","cited_title":"An Analysis of the Navy's 2025 Shipbuilding Plan","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/60732","ref_kind":"research_report","section":"Introduction","page":null,"context_sentence":"3, https://tinyurl.com/37bkemd9.","paper_id":48827,"paper_title":"An Analysis of the Navy’s 2025 Shipbuilding Plan","paper_year":null,"paper_doi":null},{"citation_id":83480,"raw_reference":"Megan Eckstein, \"US Navy Ship Programs Face Years-Long Delays Amid Labor, Supply Woes,\" Defense News (April 2, 2024), https://tinyurl.com/mr38sy32","cited_authors":"Megan Eckstein","cited_year":"2024","cited_title":"US Navy Ship Programs Face Years-Long Delays Amid Labor, Supply Woes","cited_venue":"Defense News","cited_doi":null,"cited_url":"https://tinyurl.com/mr38sy32","ref_kind":"news","section":"fn 6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83481,"raw_reference":"Congressional Budget Office, How CBO Estimates the Costs of New Ships (April 2018), www.cbo.gov/publication/53785","cited_authors":"Congressional Budget Office","cited_year":"2018","cited_title":"How CBO Estimates the Costs of New Ships","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/53785","ref_kind":"research_report","section":"fn 14","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83482,"raw_reference":"Ronald O'Rourke, Navy Virginia-Class Submarine Program and AUKUS Submarine (Pillar 1) Project: Background and Issues for Congress, Report RL32418 (Congressional Research Service, October 10, 2024), https://tinyurl.com/vbhy77ax","cited_authors":"Ronald O'Rourke","cited_year":"2024","cited_title":"Navy Virginia-Class Submarine Program and AUKUS Submarine (Pillar 1) Project: Background and Issues for Congress","cited_venue":"Congressional Research Service","cited_doi":null,"cited_url":"https://tinyurl.com/vbhy77ax","ref_kind":"research_report","section":"fn 7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83483,"raw_reference":"Ronald O'Rourke, Navy Next-Generation Attack Submarine (SSN[X]) Program: Background and Issues for Congress, Report IF11826 (Congressional Research Service, December 12, 2024), https://tinyurl.com/2p8asnmm","cited_authors":"Ronald O'Rourke","cited_year":"2024","cited_title":"Navy Next-Generation Attack Submarine (SSN[X]) Program: Background and Issues for Congress","cited_venue":"Congressional Research Service","cited_doi":null,"cited_url":"https://tinyurl.com/2p8asnmm","ref_kind":"research_report","section":"fn 7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83484,"raw_reference":"Sam LaGrone, \"Navy Could Sideline 17 Support Ships Due to Manpower Issues,\" USNI News (August 22, 2024, updated August 26, 2024), https://tinyurl.com/4mutfyb8","cited_authors":"Sam LaGrone","cited_year":"2024","cited_title":"Navy Could Sideline 17 Support Ships Due to Manpower Issues","cited_venue":"USNI News","cited_doi":null,"cited_url":"https://tinyurl.com/4mutfyb8","ref_kind":"news","section":"fn 4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83485,"raw_reference":"Justin Katz, \"Navy Lays Out Major Shipbuilding Delays, in Rare Public Accounting,\" Breaking Defense (April 2, 2024), https://tinyurl.com/3c6mh5z7","cited_authors":"Justin Katz","cited_year":"2024","cited_title":"Navy Lays Out Major Shipbuilding Delays, in Rare Public Accounting","cited_venue":"Breaking Defense","cited_doi":null,"cited_url":"https://tinyurl.com/3c6mh5z7","ref_kind":"news","section":"fn 5","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83486,"raw_reference":"Nathan Rennolds, \"Ukraine's Hi-Tech Naval Attack Drones Have Paralyzed Russia's Black Sea Fleet, Spy Chief Says,\" Business Insider (August 26, 2023), https://tinyurl.com/3cv4f6r4","cited_authors":"Nathan Rennolds","cited_year":"2023","cited_title":"Ukraine's Hi-Tech Naval Attack Drones Have Paralyzed Russia's Black Sea Fleet, Spy Chief Says","cited_venue":"Business Insider","cited_doi":null,"cited_url":"https://tinyurl.com/3cv4f6r4","ref_kind":"news","section":"fn 12","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83487,"raw_reference":"Emmanuel Grynszpan and Marie Jégo, \"In the Black Sea, Ukraine Attacks the Russian Fleet With Naval Suicide Drones,\" Le Monde (August 5, 2023), https://tinyurl.com/2x52bp8v","cited_authors":"Emmanuel Grynszpan and Marie Jégo","cited_year":"2023","cited_title":"In the Black Sea, Ukraine Attacks the Russian Fleet With Naval Suicide Drones","cited_venue":"Le Monde","cited_doi":null,"cited_url":"https://tinyurl.com/2x52bp8v","ref_kind":"news","section":"fn 12","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83528,"raw_reference":"Tony Capaccio, \"Worker Shortage Hobbles Construction of U.S. Navy Frigates,\" gCaptain.com (April 12, 2024), https://tinyurl.com/4zm9ssky","cited_authors":"Tony Capaccio","cited_year":"2024","cited_title":"Worker Shortage Hobbles Construction of U.S. Navy Frigates","cited_venue":"gCaptain.com","cited_doi":null,"cited_url":"https://tinyurl.com/4zm9ssky","ref_kind":"news","section":"fn 22","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83529,"raw_reference":"Megan Eckstein, \"Frigate Program Delayed as Shipyard Is a 'Few Hundred' Workers Short,\" Defense News (January 11, 2024), https://tinyurl.com/ypm5mma2","cited_authors":"Megan Eckstein","cited_year":"2024","cited_title":"Frigate Program Delayed as Shipyard Is a 'Few Hundred' Workers Short","cited_venue":"Defense News","cited_doi":null,"cited_url":"https://tinyurl.com/ypm5mma2","ref_kind":"news","section":"fn 22","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83530,"raw_reference":"Anthony Capaccio, \"New U.S. Nuclear-Missile Submarines Hobbled by Billions in Growing Costs and Delays,\" Bloomberg (June 8, 2022), https://tinyurl.com/bddkjtdj","cited_authors":"Anthony Capaccio","cited_year":"2022","cited_title":"New U.S. Nuclear-Missile Submarines Hobbled by Billions in Growing Costs and Delays","cited_venue":"Bloomberg","cited_doi":null,"cited_url":"https://tinyurl.com/bddkjtdj","ref_kind":"news","section":"fn 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83531,"raw_reference":"Megan Eckstein, \"Submarine Industrial Base Under Strain as Virginia-Class Parts Wearing Out Early; Implications for Columbia-Class,\" USNI News (April 20, 2021), https://tinyurl.com/ycf2hfz2","cited_authors":"Megan Eckstein","cited_year":"2021","cited_title":"Submarine Industrial Base Under Strain as Virginia-Class Parts Wearing Out Early; Implications for Columbia-Class","cited_venue":"USNI News","cited_doi":null,"cited_url":"https://tinyurl.com/ycf2hfz2","ref_kind":"news","section":"fn 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83532,"raw_reference":"Congressional Budget Office, The Capacity of the Navy's Shipyards to Maintain Its Submarines (March 2021), www.cbo.gov/publication/57026","cited_authors":"Congressional Budget Office","cited_year":"2021","cited_title":"The Capacity of the Navy's Shipyards to Maintain Its Submarines","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/57026","ref_kind":"research_report","section":"fn 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83533,"raw_reference":"Ronald O'Rourke, Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program: Background and Issues for Congress, Report R41129 (Congressional Research Service, September 30, 2024)","cited_authors":"Ronald O'Rourke","cited_year":"2024","cited_title":"Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program: Background and Issues for Congress","cited_venue":"Congressional Research Service","cited_doi":null,"cited_url":"https://go.usa.gov/xSvDe","ref_kind":"research_report","section":"fn 24","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83534,"raw_reference":"Chris Panella, \"US Navy's New Submarines are 'In Crisis' as Costs Balloon by $17 Billion, Lawmaker Says,\" Business Insider (September 20, 2024), https://tinyurl.com/369vsd25","cited_authors":"Chris Panella","cited_year":"2024","cited_title":"US Navy's New Submarines are 'In Crisis' as Costs Balloon by $17 Billion, Lawmaker Says","cited_venue":"Business Insider","cited_doi":null,"cited_url":"https://tinyurl.com/369vsd25","ref_kind":"news","section":"fn 33","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83535,"raw_reference":"Ronald O'Rourke, Navy Constellation (FFG-62) Class Frigate Program: Background and Issues for Congress, Report R44972 (Congressional Research Service, November 20, 2024), https://tinyurl.com/4xyk6rkn","cited_authors":"Ronald O'Rourke","cited_year":"2024","cited_title":"Navy Constellation (FFG-62) Class Frigate Program: Background and Issues for Congress","cited_venue":"Congressional Research Service","cited_doi":null,"cited_url":"https://tinyurl.com/4xyk6rkn","ref_kind":"research_report","section":"fn 22","page":null,"context_sentence":"2 ships per year.22 New to the program and faced with the difficult challenge of building a ship it has never built before, a second shipyard would need time to learn how to build the frigate.","paper_id":48834,"paper_title":"Navy Constellation (FFG-62) Class Frigate (Previously FFG[X]) Program: Background and Issues for Congress","paper_year":2021,"paper_doi":null},{"citation_id":83536,"raw_reference":"Congressional Budget Office, Comparing a 355-Ship Fleet With Smaller Naval Forces (March 2018), www.cbo.gov/publication/53637","cited_authors":"Congressional Budget Office","cited_year":"2018","cited_title":"Comparing a 355-Ship Fleet With Smaller Naval Forces","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/53637","ref_kind":"research_report","section":"fn 21","page":null,"context_sentence":"Indeed, from 2027 to 2033, the Navy would now carry more missile cells than it would have carried under any of the 2024 plan's alternatives, though it would then have fewer missile cells than it would have had under one or more of the 2024 alternatives through the end of the 2030s (see Figure 9).21 By the 2040s, the 2025 plan would produce a fleet with more missile cells than the 2024 plan's Alternative 1 or, to a lesser extent, Alternative 2.","paper_id":48835,"paper_title":"Comparing a 355-Ship Fleet With Smaller Naval Forces","paper_year":null,"paper_doi":null},{"citation_id":83537,"raw_reference":"Congressional Budget Office, The Cost of the Navy's New Frigate (October 2020), www.cbo.gov/publication/56669","cited_authors":"Congressional Budget Office","cited_year":"2020","cited_title":"The Cost of the Navy's New Frigate","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/56669","ref_kind":"research_report","section":"fn 39","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83538,"raw_reference":"Congressional Budget Office, Acquisition Costs of the Navy's Medium Landing Ship (April 2024), www.cbo.gov/publication/60071","cited_authors":"Congressional Budget Office","cited_year":"2024","cited_title":"Acquisition Costs of the Navy's Medium Landing Ship","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/60071","ref_kind":"research_report","section":"fn 42","page":null,"context_sentence":"The Navy, which did not specify the size of the ship that it used in its calculations, estimates that the 55 LSMs would cost less than $200 million per ship, on average. In its analysis of the Navy's 2025 shipbuilding plan, CBO estimated the costs of the smaller ship, which the agency projects would be an average of $350 million per ship.42","paper_id":48836,"paper_title":"Acquisition Costs of the Navy’s Medium Landing Ship","paper_year":null,"paper_doi":null},{"citation_id":83539,"raw_reference":"Congressional Budget Office, The Cost of Replacing Today's Naval Aviation Fleet (January 2020), www.cbo.gov/publication/55949","cited_authors":"Congressional Budget Office","cited_year":"2020","cited_title":"The Cost of Replacing Today's Naval Aviation Fleet","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/55949","ref_kind":"research_report","section":"fn 20","page":null,"context_sentence":"Specifically, to estimate the costs associated with the shipbuilding and aircraft procurement accounts, CBO first estimated the cost of each ship and aircraft procurement program.20 The agency then devel19.","paper_id":48837,"paper_title":"The Cost of Replacing Today’s Naval Aviation Fleet","paper_year":null,"paper_doi":null},{"citation_id":83540,"raw_reference":"Congressional Budget Office, Inflation in the Costs of Building Aircraft Carriers (April 2016), www.cbo.gov/publication/51469","cited_authors":"Congressional Budget Office","cited_year":"2016","cited_title":"Inflation in the Costs of Building Aircraft Carriers","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/51469","ref_kind":"research_report","section":"fn 28","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83541,"raw_reference":"Congressional Budget Office, An Analysis of the Navy's Fiscal Year 2020 Shipbuilding Plan (October 2019), www.cbo.gov/publication/55685","cited_authors":"Congressional Budget Office","cited_year":"2019","cited_title":"An Analysis of the Navy's Fiscal Year 2020 Shipbuilding Plan","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/55685","ref_kind":"research_report","section":"fn 29","page":null,"context_sentence":"3, https://tinyurl.com/37bkemd9.","paper_id":48839,"paper_title":"An Analysis of the Navy's Fiscal Year 2020 Shipbuilding Plan","paper_year":2019,"paper_doi":null},{"citation_id":83542,"raw_reference":"Congressional Budget Office, An Analysis of the Navy's Fiscal Year 2024 Shipbuilding Plan (October 2023), www.cbo.gov/publication/59508","cited_authors":"Congressional Budget Office","cited_year":"2023","cited_title":"An Analysis of the Navy's Fiscal Year 2024 Shipbuilding Plan","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/59508","ref_kind":"research_report","section":"fn 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83543,"raw_reference":"Congressional Budget Office, The Shipbuilding Composite Index and Its Rates of Change Compared With Economywide Inflation Rates (April 2024), www.cbo.gov/publication/59026","cited_authors":"Congressional Budget Office","cited_year":"2024","cited_title":"The Shipbuilding Composite Index and Its Rates of Change Compared With Economywide Inflation Rates","cited_venue":"Congressional Budget Office","cited_doi":null,"cited_url":"www.cbo.gov/publication/59026","ref_kind":"research_report","section":"fn 18","page":null,"context_sentence":"CBO regards the difference between shipbuilding inflation and overall inflation as real growth in the constant-dollar cost of building naval ships.18 For this report, CBO used the historical difference between shipbuilding inflation and inflation in the overall economy, as measured by the gross domestic product price index, to calculate the growth in its constant-dollar estimates of shipbuilding programs.","paper_id":48822,"paper_title":"The Shipbuilding Composite Index and Its Rates of Change Compared With Economywide Inflation Rates","paper_year":null,"paper_doi":null},{"citation_id":83544,"raw_reference":"Ronald O'Rourke, Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress, Report RL32109 (Congressional Research Service, December 16, 2024), https://go.usa.gov/xSKzU","cited_authors":"Ronald O'Rourke","cited_year":"2024","cited_title":"Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress","cited_venue":"Congressional Research Service","cited_doi":null,"cited_url":"https://go.usa.gov/xSKzU","ref_kind":"research_report","section":"fn 35","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":83545,"raw_reference":"Ronald O'Rourke, Navy DDG(X) Next-Generation Destroyer Program: Background and Issues for Congress, Report IF11679 (Congressional Research Service, December 12, 2024), https://go.usa.gov/xSKSR","cited_authors":"Ronald O'Rourke","cited_year":"2024","cited_title":"Navy DDG(X) Next-Generation Destroyer Program: Background and Issues for Congress","cited_venue":"Congressional Research Service","cited_doi":null,"cited_url":"https://go.usa.gov/xSKSR","ref_kind":"research_report","section":"fn 36","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}