{"document":{"doc_id":11365,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Amendments to LNG Facilities Preliminary Regulatory Impact Analysis","date":"2026-10-30","url":"https://www.regulations.gov/document/PHMSA-2019-0091-7627","source_native_id":"PHMSA-2019-0091-7627","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2019-0091"],"rins":["RIN 2137-AF45"],"related":[{"doc_id":3533,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Amendments to Liquefied Natural Gas Facilities","date":"2025-05-05"},{"doc_id":139152,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"LNG Annual Redlined Form and Instructions - PHMSA F 7100.3-1 LNG NPRM","date":"2026-10-30"},{"doc_id":139153,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Amendments to LNG Facilities Draft Environmental Impact Statement","date":"2026-10-30"},{"doc_id":139154,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"LNG Incident Redlined Form and Instructions - PHMSA F 7100.3 LNG NPRM","date":"2026-10-30"},{"doc_id":139155,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"OpID Assignment Request Redlined Form and Instructions - PHMSA F 1000.1 LNG NPRM","date":"2026-10-30"},{"doc_id":139156,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"National Registry Notification Redlined Form and Instructions - PHMSA F 1000.2 LNG NPRM","date":"2026-10-30"},{"doc_id":3215,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Amendments to Liquefied Natural Gas Facilities","date":"2026-11-03"},{"doc_id":127252,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive changes in LNG Facilities NPRM during OIRA Review","date":"2026-11-05"}],"references":[{"citation_id":246417,"raw_reference":"PHMSA, Pipeline Flagged Incidents Data – LNG 2011 to Present, available at: https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files (last visited Apr. 17, 2026)","cited_authors":"PHMSA","cited_year":"2026","cited_title":"Pipeline Flagged Incidents Data – LNG 2011 to Present","cited_venue":"PHMSA","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files","ref_kind":"dataset","section":"fn 84","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246418,"raw_reference":"Freeport LNG, Press Release, Freeport LNG Provides Summary of Root Cause Failure Analysis Report on June 8 Incident (Nov. 15, 2022)","cited_authors":"Freeport LNG","cited_year":"2022","cited_title":"Freeport LNG Provides Summary of Root Cause Failure Analysis Report on June 8 Incident","cited_venue":"Freeport LNG","cited_doi":null,"cited_url":null,"ref_kind":"news","section":"fn 86","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246419,"raw_reference":"IFO Group, Freeport LNG – June 8, 2022 Loss of Primary Containment Incident Investigation Report (Redacted Version) (Oct. 30, 2022)","cited_authors":"IFO Group","cited_year":"2022","cited_title":"Freeport LNG – June 8, 2022 Loss of Primary Containment Incident Investigation Report (Redacted Version)","cited_venue":"IFO Group","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 86","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246420,"raw_reference":"Nat. Gas Intel., Freeport LNG Signals Return of Production at All Three Trains (May 15, 2023)","cited_authors":"Nat. Gas Intel.","cited_year":"2023","cited_title":"Freeport LNG Signals Return of Production at All Three Trains","cited_venue":"Natural Gas Intelligence","cited_doi":null,"cited_url":"https://www.naturalgasintel.com/news/freeport-lng-signals-return-of-production-at-all-three-trains/","ref_kind":"news","section":"fn 90","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246421,"raw_reference":"EIA, Natural Gas Weekly (June 16, 2022)","cited_authors":"EIA","cited_year":"2022","cited_title":"Natural Gas Weekly","cited_venue":"U.S. Energy Information Administration","cited_doi":null,"cited_url":"https://www.eia.gov/naturalgas/weekly/archivenew_ngwu/2022/06_16/","ref_kind":"dataset","section":"fn 92","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246422,"raw_reference":"Cheniere, 2022 Annual Report","cited_authors":"Cheniere","cited_year":"2022","cited_title":"2022 Annual Report","cited_venue":"Cheniere Partners","cited_doi":null,"cited_url":"https://cqpir.cheniere.com/_assets/_4cb0852e1eb56b60db38df90ef9425c9/chenierepartners/db/899/7825/annual_report/CQP+2022+Annual+Report+-+Final.pdf","ref_kind":"other","section":"fn 94","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246423,"raw_reference":"Int’l Gas Union, 2023 World LNG Report","cited_authors":"International Gas Union","cited_year":"2023","cited_title":"2023 World LNG Report","cited_venue":"International Gas Union","cited_doi":null,"cited_url":"https://www.igu.org/igu-reports/lng2023-world-lng-report","ref_kind":"research_report","section":"fn 95","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246424,"raw_reference":"GEXCON, LNG Facility Siting: The Benefits of Using Advanced Modelling Tools in Your Study","cited_authors":"GEXCON","cited_year":"2026","cited_title":"LNG Facility Siting: The Benefits of Using Advanced Modelling Tools in Your Study","cited_venue":"GEXCON","cited_doi":null,"cited_url":"https://www.gexcon.com/resources/blog/lng-facility-siting-the-benefits-of-using-advanced-modelling-tools-in-your-study/","ref_kind":"web_page","section":"fn 104","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246425,"raw_reference":"EIA, Annual Energy Outlook 2026 Table 35: Transportation Sector Energy Use by Mode and Type (Apr. 2026)","cited_authors":"EIA","cited_year":"2026","cited_title":"Annual Energy Outlook 2026 Table 35: Transportation Sector Energy Use by Mode and Type","cited_venue":"U.S. Energy Information Administration","cited_doi":null,"cited_url":"https://www.eia.gov/outlooks/aeo/data/browser/","ref_kind":"dataset","section":"fn 102","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246426,"raw_reference":"EIA, Natural Gas Annual Respondent Query System (Feb. 2026)","cited_authors":"EIA","cited_year":"2026","cited_title":"Natural Gas Annual Respondent Query System (EIA-176 data)","cited_venue":"U.S. Energy Information Administration","cited_doi":null,"cited_url":"https://www.eia.gov/naturalgas/ngqs/","ref_kind":"dataset","section":"fn 119","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246427,"raw_reference":"U.S. Census Bureau, ACS Demographic and Housing Estimates, 2024 ACS 5-Year Estimates Data Profiles, at Table DP05","cited_authors":"U.S. Census Bureau","cited_year":"2024","cited_title":"ACS Demographic and Housing Estimates, 2024 ACS 5-Year Estimates Data Profiles","cited_venue":"U.S. Census Bureau","cited_doi":null,"cited_url":"https://data.census.gov/table/ACSDP5Y2024.DP05?q=DP05","ref_kind":"dataset","section":"fn 120","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246428,"raw_reference":"EIA, U.S. Natural Gas Consumption by End Use: Volumes Delivered to Consumers","cited_authors":"EIA","cited_year":"2026","cited_title":"U.S. Natural Gas Consumption by End Use: Volumes Delivered to Consumers","cited_venue":"U.S. Energy Information Administration","cited_doi":null,"cited_url":"https://www.eia.gov/dnav/ng/NG_CONS_SUM_DCU_NUS_A.htm","ref_kind":"dataset","section":"fn 111","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246429,"raw_reference":"EIA, Annual Energy Outlook 2026, at Table 62","cited_authors":"EIA","cited_year":"2026","cited_title":"Annual Energy Outlook 2026","cited_venue":"U.S. Energy Information Administration","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"fn 112","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246430,"raw_reference":"CH·IV Int’l, Comments on the ANPRM, Docket ID PHMSA-2019-0091-7615, at 5.","cited_authors":"CH·IV Int’l","cited_year":"2019","cited_title":"Comments on the ANPRM, Docket ID PHMSA-2019-0091-7615","cited_venue":"PHMSA docket","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 4.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246641,"raw_reference":"GAO, Natural Gas Exports: Updated Guidance and Regulations Could Improve Facility Permitting Processes (Aug. 6, 2020).","cited_authors":"GAO","cited_year":"2020","cited_title":"Natural Gas Exports: Updated Guidance and Regulations Could Improve Facility Permitting Processes","cited_venue":"Government Accountability Office","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"1.2 Need for Action, fn 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246642,"raw_reference":"GTT N. Am. (GTT), Technology Included Since NFPA 59A-2001: Membrane LNG Storage Tanks, at 22 (May 2016)","cited_authors":"GTT N. Am.","cited_year":"2016","cited_title":"Technology Included Since NFPA 59A-2001: Membrane LNG Storage Tanks","cited_venue":"GTT North America","cited_doi":null,"cited_url":"https://primis-meetings.phmsa.dot.gov/meetings/0d897511-5d66-4b52-be1c-88ace4403d75/files/8d03078f-76ef-4660-9304-47f2c4f928b4/18th_May_-_9_GTT_Membrane_Tanks_Denton.pdf","ref_kind":"other","section":"3.9.2 Storage Tank Design, fn 77","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246643,"raw_reference":"Michael Baker Jr., Inc., Basis of Estimate, at 4 (July 2013)","cited_authors":"Michael Baker Jr., Inc.","cited_year":"2013","cited_title":"Basis of Estimate","cited_venue":"Michael Baker Jr., Inc.","cited_doi":null,"cited_url":"https://www.interiorgas.com/wpdm-package/lng-storage-tank-costanalysis/?wpdmdl=4912&ind=1457742409200&refresh=1bd7e961&filename=MBJ_StorageRpt_July2013.pdf","ref_kind":"research_report","section":"3.9.2 Storage Tank Design, fn 78","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246644,"raw_reference":"Morningstar DBRS, From Risk to Relevance: Middle East Disruption Elevates North American LNG (Mar. 25, 2026)","cited_authors":"Morningstar DBRS","cited_year":"2026","cited_title":"From Risk to Relevance: Middle East Disruption Elevates North American LNG","cited_venue":"Morningstar DBRS","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"2.3.1 Export Facilities, fn 36","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246645,"raw_reference":"Corey Paul, CERAWEEK: Venture Global Eyes More Mid-Term Deals as Middle East War Lifts Demand, S&P Global (Mar. 23, 2026)","cited_authors":"Corey Paul","cited_year":"2026","cited_title":"CERAWEEK: Venture Global Eyes More Mid-Term Deals as Middle East War Lifts Demand","cited_venue":"S&P Global","cited_doi":null,"cited_url":"https://www.spglobal.com/energy/en/news-research/latest-news/lng/032326-ceraweek-venture-global-eyes-more-mid-term-deals-as-middle-east-war-lifts-demand","ref_kind":"news","section":"2.3.1 Export Facilities, fn 37","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246646,"raw_reference":"OMB, Circular A-4, at 31 (Sep. 17, 2003)","cited_authors":"OMB","cited_year":"2003","cited_title":"Circular A-4","cited_venue":"Office of Management and Budget","cited_doi":null,"cited_url":"https://www.whitehouse.gov/wp-content/uploads/2025/08/CircularA-4.pdf","ref_kind":"government_report","section":"2.1.2 Discounting of Future Costs and Benefits, fn 8","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246647,"raw_reference":"EIA, Annual Energy Outlook 2026 (Apr. 2026)","cited_authors":"U.S. Energy Information Administration","cited_year":"2026","cited_title":"Annual Energy Outlook 2026","cited_venue":"EIA","cited_doi":null,"cited_url":"https://www.eia.gov/outlooks/aeo/","ref_kind":"dataset","section":"2.3.1 Export Facilities, fn 29","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246648,"raw_reference":"PHMSA, LNG Plant Requirements: Frequently Asked Questions, at G1 (Sep. 11, 2025)","cited_authors":"PHMSA","cited_year":"2025","cited_title":"LNG Plant Requirements: Frequently Asked Questions","cited_venue":"PHMSA","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/pipeline/liquified-natural-gas/lng-plant-requirements-frequently-asked-questions","ref_kind":"web_page","section":"1.3.2, fn 6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246649,"raw_reference":"Eversource Energy, Comments on the ANPRM, Docket ID PHMSA-2019-0091-7602, at 15–17 (July 8, 2025)","cited_authors":"Eversource Energy","cited_year":"2025","cited_title":"Comments on the ANPRM, Docket ID PHMSA-2019-0091-7602","cited_venue":"Eversource Energy","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"3.5.1 Subpart C Requirements, fn 48","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246650,"raw_reference":"BLS, News Release: Employer Costs for Employee Compensation – June 2025, at Table 5 (Sep. 12, 2025)","cited_authors":"U.S. Bureau of Labor Statistics","cited_year":"2025","cited_title":"News Release: Employer Costs for Employee Compensation – June 2025","cited_venue":"BLS","cited_doi":null,"cited_url":"https://www.bls.gov/bls/news-release/ecec.htm#2025","ref_kind":"dataset","section":"3.1.3 Step Three, fn 42","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}