Positive Train Control Systems (RRR)
Federal Register2014-08-22 · DEPARTMENT OF TRANSPORTATION; Federal Railroad Administration · Rule · 2014-19849
Final rule.
FRA's final rule primarily amends the regulations implementing a requirement of the Rail Safety Improvement Act of 2008 that certain passenger and freight railroads install positive train control (PTC) systems governing operations on certain main line tracks. This final rule revises an existing regulatory exception to the requirement to install a PTC system for track segments carrying freight only that present a de minimis safety risk. The final rule also adds a new exception for PTC-unequipped freight trains associated with certain freight yard operations to operate within PTC systems. The final rule also revises the existing regulations related to en route failures of a PTC system, adds new provisions related to other failures of a PTC system, and amends the regulations on applications for approval of certain modifications of signal and train control systems. Finally, this final rule makes technical amendments to FRA's other signal and train control regulations and FRA's regulations governing highway-rail grade crossing warning systems.
Original sourceXML (238 KB)PDF (324 KB)
Other documents for the same rulemaking (all, by stage)
References: 1 extracted, 1 linked to papers
Page 1Download these results: CSV · JSON
Athaphon Kawprasert and Christopher P. L. Barkan, Effect of Train Speed on Risk Analysis of Transporting Hazardous Materials by Rail, 2159 Transportation Research Record 59 (Dec. 2010)
By moving from a limitation based on track class (restricting the speed of all movement over the track segment) to a speed restriction for only those trains carrying PIH materials, the revised rule will encourage routing the PIH materials traffic over track segments maintained to a higher quality, which should decrease the risk of track-caused incidents.\3\ Track-caused accidents and incidents are generally not PTC-preventable, but represent a larger percentage of accidents and incidents than PTC-preventable accidents and are appropriately considered when considering the overall level of risk posed by operations over a track segment. --------------------------------------------------------------------------- ---------------------------------------------------------------------------