{"document":{"doc_id":10837,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement","doc_type":"Proposed Rule","title":"Oil and Gas and Sulphur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control","date":"2015-04-17","url":"https://www.federalregister.gov/documents/2015/04/17/2015-08587/oil-and-gas-and-sulphur-operations-in-the-outer-continental-shelf-blowout-preventer-systems-and-well","source_native_id":"2015-08587","status":"fetched","abstract":"The Bureau of Safety and Environmental Enforcement (BSEE) proposes new regulations in order to consolidate equipment and operational requirements that are common to other subparts pertaining to offshore oil and gas drilling, completions, workovers, and decommissioning. This proposed rule would focus, at this time, on blowout preventer (BOP) requirements, including incorporation of industry standards and revising existing regulations. The proposed rule would also include reforms in the areas of well design, well control, casing, cementing, real-time well monitoring, and subsea containment. The proposed rule would address and implement multiple recommendations resulting from various investigations of the Deepwater Horizon incident. This proposed rule would also incorporate guidance from several Notices to Lessees and Operators (NTLs) and revise provisions related to drilling, workover, completion, and decommissioning operations to enhance safety and environmental protection.","action":"Proposed rule."},"dockets":["BSEE-2015-0002"],"rins":["RIN 1014-AA11"],"related":[{"doc_id":9939,"source":"ria","org":"BSEE","doc_type":"regulatory_impact_analysis","title":"BSEE BOP-Well Control NPRM RIA 04-09-14","date":"2015-04-17"},{"doc_id":10734,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement","doc_type":"Proposed Rule (administrative)","title":"Oil and Gas and Sulphur Operations on the Outer Continental Shelf-Blowout Preventer Systems and Well Control","date":"2015-06-03"},{"doc_id":9873,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement","doc_type":"Rule","title":"Oil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control","date":"2016-04-29"},{"doc_id":9936,"source":"ria","org":"BSEE","doc_type":"regulatory_impact_analysis","title":"AA11 RIA.BSEE Well Control RIA","date":"2016-05-09"},{"doc_id":392255,"source":"docket_item","org":"BSEE","doc_type":"other","title":"AA11 EA with signed FONSI (4-12-16)","date":"2016-05-09"}],"references":[{"citation_id":60410,"raw_reference":"\"Deepwater Horizon Oil Spill: Recent Activities and Ongoing Developments,\" J. Ramseur & C. Hagerty (2014), Congressional Research Office, available at: http://www.fas.org/sgp/crs/misc/R42942.pdf.","cited_authors":"J. Ramseur & C. Hagerty","cited_year":"2014","cited_title":"Deepwater Horizon Oil Spill: Recent Activities and Ongoing Developments","cited_venue":"Congressional Research Office","cited_doi":null,"cited_url":"http://www.fas.org/sgp/crs/misc/R42942.pdf","ref_kind":"research_report","section":"fn 6","page":null,"context_sentence":"As was evidenced by the Deepwater Horizon incident (which began with a blowout at the Macondo well) on April 20, 2010, blowouts can result in catastrophic consequences.\\6\\ The government and industry conducted multiple investigations to determine the cause of the Deepwater Horizon incident; many of these investigations identified BOP performance as a concern.","paper_id":71684,"paper_title":"Deepwater Horizon Oil Spill: Recent Activities and Ongoing Developments","paper_year":2013,"paper_doi":null},{"citation_id":60411,"raw_reference":"\"Blowout Preventer (BOP) Failure Event and Maintenance, Inspection and Test (MIT) Data,\" American Bureau of Shipping and ABSG Consulting, under BSEE contract M11PC00027 (June 2013)","cited_authors":"American Bureau of Shipping; ABSG Consulting","cited_year":"2013","cited_title":"Blowout Preventer (BOP) Failure Event and Maintenance, Inspection and Test (MIT) Data","cited_venue":"BSEE contract M11PC00027","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 14","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":60412,"raw_reference":"\"Deepwater Horizon Blowout Preventer Failure Analysis: Report to the U.S. Chemical Safety and Hazard Investigation Board,\" Engineering Services (2014)","cited_authors":"Engineering Services","cited_year":"2014","cited_title":"Deepwater Horizon Blowout Preventer Failure Analysis: Report to the U.S. Chemical Safety and Hazard Investigation Board","cited_venue":"U.S. Chemical Safety and Hazard Investigation Board","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 14","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":60413,"raw_reference":"\"Economic Analysis Methodology for the Five Year OCS Oil and Gas Leasing Program for 2012-2017\" (2012) (the BOEM Case Study)","cited_authors":"Bureau of Ocean Energy Management","cited_year":"2012","cited_title":"Economic Analysis Methodology for the Five Year OCS Oil and Gas Leasing Program for 2012-2017","cited_venue":"Bureau of Ocean Energy Management","cited_doi":null,"cited_url":"http://www.boem.gov/uploadedFiles/BOEM/Oil_and_Gas_Energy_Program/Leasing/Five_Year_Program/2012-2017_Five_Year_Program/PFP%20EconMethodology.pdf","ref_kind":"research_report","section":"fn 15","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":60414,"raw_reference":"Previous MMS studies indicate a total of 126 blowouts during drilling operations on the OCS between 1971 and 2006.","cited_authors":"Minerals Management Service","cited_year":null,"cited_title":"Previous MMS studies (blowouts during drilling operations on the OCS, 1971-2006)","cited_venue":"Minerals Management Service","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 13","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61560,"raw_reference":"REPORT REGARDING THE CAUSES OF THE APRIL 20, 2010 MACONDO WELL BLOWOUT","cited_authors":"DOI JIT (Department of the Interior / Department of Homeland Security Joint Investigation Team)","cited_year":"2011","cited_title":"Report Regarding the Causes of the April 20, 2010 Macondo Well Blowout","cited_venue":"Department of the Interior / Department of Homeland Security","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"I. Background, Deepwater Horizon Investigations, DOI/DHS Investigation","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61561,"raw_reference":"DEEP WATER, The Gulf Oil Disaster and the Future of Offshore Drilling.","cited_authors":"National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling","cited_year":"2011","cited_title":"Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling","cited_venue":"National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"I. Background, Deepwater Horizon Investigations, National Commission","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61562,"raw_reference":"Macondo: The Gulf Oil Disaster.","cited_authors":"Chief Counsel for the National Commission","cited_year":"2011","cited_title":"Macondo: The Gulf Oil Disaster","cited_venue":"National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"I. Background, Deepwater Horizon Investigations, Chief Counsel for the National Commission","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61563,"raw_reference":"Macondo Well-Deepwater Horizon Blowout.","cited_authors":"National Academy of Engineering / National Research Council committee","cited_year":"2011","cited_title":"Macondo Well-Deepwater Horizon Blowout","cited_venue":"National Academy of Engineering / National Research Council","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"I. Background, Deepwater Horizon Investigations, National Academy of Engineering","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61564,"raw_reference":"Technical Assessment & Research (TAR) Project 383, Performance of Deepwater BOP Equipment During Well-control Events","cited_authors":"MMS","cited_year":null,"cited_title":"Performance of Deepwater BOP Equipment During Well-control Events","cited_venue":"Technical Assessment and Research Program, Minerals Management Service","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"I. Background, Shearing Requirements","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61565,"raw_reference":"TAR Project 408, Development of a Blowout Intervention Method and Dynamic Kill Simulated for Blowouts Occurring Ultra-Deepwater","cited_authors":"MMS","cited_year":null,"cited_title":"Development of a Blowout Intervention Method and Dynamic Kill Simulated for Blowouts Occurring Ultra-Deepwater","cited_venue":"Technical Assessment and Research Program, Minerals Management Service","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"I. Background, Shearing Requirements","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61566,"raw_reference":"TAR Project 431, Evaluation of Secondary Intervention Methods in Well-control","cited_authors":"MMS","cited_year":null,"cited_title":"Evaluation of Secondary Intervention Methods in Well-control","cited_venue":"Technical Assessment and Research Program, Minerals Management Service","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"I. Background, Shearing Requirements","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61567,"raw_reference":"TAR Project 455, Review of Shear Ram Capabilities","cited_authors":"MMS","cited_year":null,"cited_title":"Review of Shear Ram Capabilities","cited_venue":"Technical Assessment and Research Program, Minerals Management Service","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"I. Background, Shearing Requirements","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61568,"raw_reference":"TAR Project 463, Evaluation of Sheer Ram Capabilities","cited_authors":"MMS","cited_year":null,"cited_title":"Evaluation of Shear Ram Capabilities","cited_venue":"Technical Assessment and Research Program, Minerals Management Service","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"I. Background, Shearing Requirements","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":61569,"raw_reference":"API RP 53—Recommended Practices for Blowout Prevention Equipment Systems for Drilling Wells, Third Edition, March 1, 1997 (Reaffirmed September 1, 2004)","cited_authors":"American Petroleum Institute","cited_year":"1997","cited_title":"Recommended Practices for Blowout Prevention Equipment Systems for Drilling Wells","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"I. Background, Equipment Reliability and Performance","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}