{"document":{"doc_id":10682,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 2-4; A BRIEF SUMMARY OF OSHAS PRELIMINARY ESTIMATES OF THE ECONOMIC IMPACTS, COSTS, AND BENEFITS OF THE PROPOSED RULE AS A WHOLE. CONTRACT NO. J-9-F-9-0013. TASK ORDER NUMBER 29. OPTION YEAR 3.","date":"2003-02-14","url":"https://www.regulations.gov/document/OSHA-S215-2006-0063-0011","source_native_id":"OSHA-S215-2006-0063-0011","status":"fetched","abstract":null,"action":null},"dockets":["OSHA-S215-2006-0063"],"rins":["RIN 1218-AA32","RIN 1218-AB67"],"related":[{"doc_id":10684,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 7-3; PREPARATION OF AN ECONOMIC IMPACT STUDY FOR THE PROPOSED OSHA REGULATION COVERING ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION. TASK ORDER NO. 1 CONTRACT NO. J-9-F-5-0057.","date":"1986-05-31"},{"doc_id":10668,"source":"ria","org":"OSHA","doc_type":"regulatory_analysis","title":"Supporting Exhibit 2; OFFICE OF REGULATORY ANALYSIS, OSHA","date":"1987-10-23"},{"doc_id":10662,"source":"ria","org":"OSHA","doc_type":"regulatory_flexibility_analysis","title":"Supporting Exhibit 32;  Regulatory Impact and Regulatory Flexibility Analysis of the Electrical Safety-Related Work Practices Standard for General Industry (29 CFR 1910, Subpart S)","date":"1990-06-12"},{"doc_id":10700,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 3; FINAL REPORT. ANAYTICAL SUPPORT AND DATA GATHERING FOR A PRELIMINARY ECONOMIC ANALYSIS FOR A PROPOSED STANDARD FOR WORK ON ELEC POWER TRANSMISSION AND DISTRIBUTION LINES AND EQUIP (29 CFR 1910.269 AND 29 CFR 1926 - SUBPART V). CONTRACT NO. J-9-F-9-0013","date":"2003-02-14"},{"doc_id":10678,"source":"ria","org":"OSHA","doc_type":"regulatory_flexibility_analysis","title":"Supporting Exhibit 2-3; DRAFT COPY OF OSHAS PRELIMINARY INITIAL REGULATORY FLEXIBILITY ANALYSIS, WHICH INCLUDES THE AGENCYS ANALYSIS OF SOME ALTERNATIVES TO THE PROPOSED RULE.","date":"2003-04-07"},{"doc_id":10672,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 7-1; REVISED FINAL REPORT - ANALYTICAL SUPPORT AND DATA GATHERING FRO A PRELIMINARY ECONOMIC ANALYSIS FOR PROPOSED STANDARDS FOR WORK ON ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION LINES AND EQUIPMENT (29 CFR 1910.269 AND 29 CFR 1926-SUBPART V)","date":"2005-06-08"},{"doc_id":18249,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment","date":"2005-06-15"},{"doc_id":18098,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule (administrative)","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Extension of Comment Period; Change in Date of Public Hearing","date":"2005-10-12"},{"doc_id":16405,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record","date":"2008-10-22"},{"doc_id":15668,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record; Notice of Informal Public Hearing","date":"2009-09-14"},{"doc_id":131216,"source":"docket_item","org":"OSHA","doc_type":"review_record","title":"Office of Management and Budget. 2003. Circular A-4","date":"2014-04-01"},{"doc_id":11676,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment","date":"2014-04-11"},{"doc_id":11287,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Rule (administrative)","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections","date":"2014-09-24"},{"doc_id":10390,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Rule (administrative)","title":"Electrical Safety-Related Work Practices; Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections","date":"2015-10-05"}],"references":[{"citation_id":171704,"raw_reference":"Means (1998)","cited_authors":"Means","cited_year":"1998","cited_title":null,"cited_venue":"Means","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Executive Summary (ES.11 fn)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171705,"raw_reference":"Lab Safety, 2002","cited_authors":"Lab Safety","cited_year":"2002","cited_title":null,"cited_venue":"Lab Safety (industry supplier)","cited_doi":null,"cited_url":null,"ref_kind":"web_page","section":"Executive Summary, cost assumptions for FRA clothing","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171706,"raw_reference":"BLS, 2001b, National Industry-Specific Occupational Employment and Wage Estimates","cited_authors":"Bureau of Labor Statistics","cited_year":"2001","cited_title":"National Industry-Specific Occupational Employment and Wage Estimates","cited_venue":"Bureau of Labor Statistics","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Executive Summary, wage rates","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171707,"raw_reference":"BLS, 2000, Employer Costs for Employee Compensation, March 2000","cited_authors":"Bureau of Labor Statistics","cited_year":"2000","cited_title":"Employer Costs for Employee Compensation","cited_venue":"Bureau of Labor Statistics","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Executive Summary, benefits data","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171708,"raw_reference":"NIOSH, 1988, MOSH 1981-1983 National Occupational Exposure Survey","cited_authors":"National Institute for Occupational Safety and Health","cited_year":"1988","cited_title":"National Occupational Exposure Survey, 1981-1983","cited_venue":"NIOSH","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Executive Summary, labor turnover rate","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171709,"raw_reference":"USDOC, 2000b, 1997 Economic Census","cited_authors":"U.S. Department of Commerce","cited_year":"2000","cited_title":"1997 Economic Census","cited_venue":"U.S. Department of Commerce, Bureau of the Census","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Executive Summary, Industries Affected","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171710,"raw_reference":"ENR, 2000b, annual specialty contractors survey","cited_authors":"Engineering News-Record","cited_year":"2000","cited_title":"Annual specialty contractors survey","cited_venue":"Engineering News-Record","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Executive Summary, Industries Affected","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171711,"raw_reference":"USDOC, 2000a (1996 Bureau of the Census data on firm size)","cited_authors":"U.S. Department of Commerce, Bureau of the Census","cited_year":"2000","cited_title":"1996 firm size data","cited_venue":"U.S. Department of Commerce, Bureau of the Census","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Executive Summary, SBREFA firm estimates","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171712,"raw_reference":"ERG, 1986, 1990, and 1993 supporting contractor reports","cited_authors":"ERG","cited_year":"1993","cited_title":"Supporting contractor reports for general industry power transmission and distribution rulemaking","cited_venue":"Eastern Research Group","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Executive Summary, Table ES.6 discussion","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}