{"document":{"doc_id":10678,"source":"ria","org":"OSHA","doc_type":"regulatory_flexibility_analysis","title":"Supporting Exhibit 2-3; DRAFT COPY OF OSHAS PRELIMINARY INITIAL REGULATORY FLEXIBILITY ANALYSIS, WHICH INCLUDES THE AGENCYS ANALYSIS OF SOME ALTERNATIVES TO THE PROPOSED RULE.","date":"2003-04-07","url":"https://www.regulations.gov/document/OSHA-S215-2006-0063-0010","source_native_id":"OSHA-S215-2006-0063-0010","status":"fetched","abstract":null,"action":null},"dockets":["OSHA-S215-2006-0063"],"rins":["RIN 1218-AA32","RIN 1218-AB67"],"related":[{"doc_id":10684,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 7-3; PREPARATION OF AN ECONOMIC IMPACT STUDY FOR THE PROPOSED OSHA REGULATION COVERING ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION. TASK ORDER NO. 1 CONTRACT NO. J-9-F-5-0057.","date":"1986-05-31"},{"doc_id":10668,"source":"ria","org":"OSHA","doc_type":"regulatory_analysis","title":"Supporting Exhibit 2; OFFICE OF REGULATORY ANALYSIS, OSHA","date":"1987-10-23"},{"doc_id":10662,"source":"ria","org":"OSHA","doc_type":"regulatory_flexibility_analysis","title":"Supporting Exhibit 32;  Regulatory Impact and Regulatory Flexibility Analysis of the Electrical Safety-Related Work Practices Standard for General Industry (29 CFR 1910, Subpart S)","date":"1990-06-12"},{"doc_id":10682,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 2-4; A BRIEF SUMMARY OF OSHAS PRELIMINARY ESTIMATES OF THE ECONOMIC IMPACTS, COSTS, AND BENEFITS OF THE PROPOSED RULE AS A WHOLE. CONTRACT NO. J-9-F-9-0013. TASK ORDER NUMBER 29. OPTION YEAR 3.","date":"2003-02-14"},{"doc_id":10700,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 3; FINAL REPORT. ANAYTICAL SUPPORT AND DATA GATHERING FOR A PRELIMINARY ECONOMIC ANALYSIS FOR A PROPOSED STANDARD FOR WORK ON ELEC POWER TRANSMISSION AND DISTRIBUTION LINES AND EQUIP (29 CFR 1910.269 AND 29 CFR 1926 - SUBPART V). CONTRACT NO. J-9-F-9-0013","date":"2003-02-14"},{"doc_id":10672,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 7-1; REVISED FINAL REPORT - ANALYTICAL SUPPORT AND DATA GATHERING FRO A PRELIMINARY ECONOMIC ANALYSIS FOR PROPOSED STANDARDS FOR WORK ON ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION LINES AND EQUIPMENT (29 CFR 1910.269 AND 29 CFR 1926-SUBPART V)","date":"2005-06-08"},{"doc_id":18249,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment","date":"2005-06-15"},{"doc_id":18098,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule (administrative)","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Extension of Comment Period; Change in Date of Public Hearing","date":"2005-10-12"},{"doc_id":16405,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record","date":"2008-10-22"},{"doc_id":15668,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record; Notice of Informal Public Hearing","date":"2009-09-14"},{"doc_id":131216,"source":"docket_item","org":"OSHA","doc_type":"review_record","title":"Office of Management and Budget. 2003. Circular A-4","date":"2014-04-01"},{"doc_id":11676,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment","date":"2014-04-11"},{"doc_id":11287,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Rule (administrative)","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections","date":"2014-09-24"},{"doc_id":10390,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Rule (administrative)","title":"Electrical Safety-Related Work Practices; Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections","date":"2015-10-05"}],"references":[{"citation_id":171607,"raw_reference":"CONSAD report (2/14/03), Table C.1","cited_authors":"CONSAD Research Corporation","cited_year":"2003","cited_title":"Table C.1 (Compliance costs analysis)","cited_venue":"CONSAD Research Corporation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Table 1 source note","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171608,"raw_reference":"CONSAD report (9/18/02) (fall protection costs)","cited_authors":"CONSAD Research Corporation","cited_year":"2002","cited_title":"Fall protection costs","cited_venue":"CONSAD Research Corporation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Table 1 source note","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171609,"raw_reference":"U.S. Department of Commerce, Bureau of the Census (USDOC, 2000a)","cited_authors":"U.S. Department of Commerce, Bureau of the Census","cited_year":"2000","cited_title":"1997 Economic Census firm size data","cited_venue":"U.S. Department of Commerce, Bureau of the Census","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Description and Estimate of Affected Small Entities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":171610,"raw_reference":"CONSAD analysis (preliminary economic analysis, Appendix A)","cited_authors":"CONSAD Research Corporation","cited_year":"2003","cited_title":"CONSAD's Preliminary Economic Analysis for the Draft Proposed OSHA Electric Power Standard","cited_venue":"CONSAD Research Corporation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix A","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}